Skip to content
  • Hjem
  • Seneste
  • Etiketter
  • Populære
  • Verden
  • Bruger
  • Grupper
Temaer
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Kollaps
FARVEL BIG TECH
  1. Forside
  2. Ikke-kategoriseret
  3. “To switch on that one data center, we would need to shut off power for half the country,” he said of the project.

“To switch on that one data center, we would need to shut off power for half the country,” he said of the project.

Planlagt Fastgjort Låst Flyttet Ikke-kategoriseret
5 Indlæg 5 Posters 0 Visninger
  • Ældste til nyeste
  • Nyeste til ældste
  • Most Votes
Svar
  • Svar som emne
Login for at svare
Denne tråd er blevet slettet. Kun brugere med emne behandlings privilegier kan se den.
  • ketan@climatejustice.socialK This user is from outside of this forum
    ketan@climatejustice.socialK This user is from outside of this forum
    ketan@climatejustice.social
    wrote sidst redigeret af
    #1

    “To switch on that one data center, we would need to shut off power for half the country,” he said of the project. “That’s when I knew there was a problem.”

    https://www.semafor.com/article/05/06/2026/energy-shortfall-problem-scuppers-kenyas-1b-microsoft-data-center

    gonzo_askold@mastodon.socialG kevinrns@mstdn.socialK peter_slwk@mastodon.socialP 3 Replies Last reply
    1
    0
    • ketan@climatejustice.socialK ketan@climatejustice.social

      “To switch on that one data center, we would need to shut off power for half the country,” he said of the project. “That’s when I knew there was a problem.”

      https://www.semafor.com/article/05/06/2026/energy-shortfall-problem-scuppers-kenyas-1b-microsoft-data-center

      gonzo_askold@mastodon.socialG This user is from outside of this forum
      gonzo_askold@mastodon.socialG This user is from outside of this forum
      gonzo_askold@mastodon.social
      wrote sidst redigeret af
      #2

      @ketan

      always measure only after everything is already build and billions are spent. vibe building, vibe accounting, vibe utilities

      marymaraskittenbakery@troet.cafeM 1 Reply Last reply
      0
      • ketan@climatejustice.socialK ketan@climatejustice.social

        “To switch on that one data center, we would need to shut off power for half the country,” he said of the project. “That’s when I knew there was a problem.”

        https://www.semafor.com/article/05/06/2026/energy-shortfall-problem-scuppers-kenyas-1b-microsoft-data-center

        kevinrns@mstdn.socialK This user is from outside of this forum
        kevinrns@mstdn.socialK This user is from outside of this forum
        kevinrns@mstdn.social
        wrote sidst redigeret af
        #3

        @ketan

        Some people are fooled by the "data centre" mass assault on their town/state and on all of society.

        Bit a growing number are fighting back

        Data centres are the 21st Century's "outsourcing" -- stealing electricity, stealing WATER(!), stealing jobs and making you pay.

        Another of the untenable moral costs of AI.

        #dataCenter #ai #datacentres

        1 Reply Last reply
        0
        • gonzo_askold@mastodon.socialG gonzo_askold@mastodon.social

          @ketan

          always measure only after everything is already build and billions are spent. vibe building, vibe accounting, vibe utilities

          marymaraskittenbakery@troet.cafeM This user is from outside of this forum
          marymaraskittenbakery@troet.cafeM This user is from outside of this forum
          marymaraskittenbakery@troet.cafe
          wrote sidst redigeret af
          #4

          @gonzo_askold @ketan
          Oh, you don't understand, they know, they just don't care.
          People shall be made redundant but for those needed as serfs, that's the whole thing right now.
          So the ugly rich can fight over all the remaining resources and don't have to share anything, let alone discuss their awful behaviour with those pesky little people

          1 Reply Last reply
          0
          • ketan@climatejustice.socialK ketan@climatejustice.social

            “To switch on that one data center, we would need to shut off power for half the country,” he said of the project. “That’s when I knew there was a problem.”

            https://www.semafor.com/article/05/06/2026/energy-shortfall-problem-scuppers-kenyas-1b-microsoft-data-center

            peter_slwk@mastodon.socialP This user is from outside of this forum
            peter_slwk@mastodon.socialP This user is from outside of this forum
            peter_slwk@mastodon.social
            wrote sidst redigeret af
            #5

            @ketan "they said it would run on geothermal power"

            It should say:

            "they said it would run on almoste all geothermal power the country currently has"

            Because that's the truth. When these companies say something, it doesn't mean thet they will do it. When they say "it will run on renewable power" they mean "you will need to provide the power and it must be renewable."

            1 Reply Last reply
            0
            • pelle@veganism.socialP pelle@veganism.social shared this topic
            Svar
            • Svar som emne
            Login for at svare
            • Ældste til nyeste
            • Nyeste til ældste
            • Most Votes


            • Log ind

            • Har du ikke en konto? Tilmeld

            • Login or register to search.
            Powered by NodeBB Contributors
            Graciously hosted by data.coop
            • First post
              Last post
            0
            • Hjem
            • Seneste
            • Etiketter
            • Populære
            • Verden
            • Bruger
            • Grupper