Skip to content
  • Hjem
  • Seneste
  • Etiketter
  • Populære
  • Verden
  • Bruger
  • Grupper
Temaer
  • Light
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Kollaps
FARVEL BIG TECH
  1. Forside
  2. Ikke-kategoriseret
  3. The NASA Artemis II mission is targeted for launch as early as Feb.

The NASA Artemis II mission is targeted for launch as early as Feb.

Planlagt Fastgjort Låst Flyttet Ikke-kategoriseret
64 Indlæg 31 Posters 0 Visninger
  • Ældste til nyeste
  • Nyeste til ældste
  • Most Votes
Svar
  • Svar som emne
Login for at svare
Denne tråd er blevet slettet. Kun brugere med emne behandlings privilegier kan se den.
  • akasci@fosstodon.orgA akasci@fosstodon.org

    NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

    The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

    At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

    https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
    2/n

    jpshoer@mastodon.socialJ This user is from outside of this forum
    jpshoer@mastodon.socialJ This user is from outside of this forum
    jpshoer@mastodon.social
    wrote sidst redigeret af
    #11

    @AkaSci My Artemis II launch date predictor tool -- which fits a line to (time remaining until announced launch date) vs. (date of announcement) and calculates the intercept -- is currently predicting 1 April 2026.

    1 Reply Last reply
    0
    • akasci@fosstodon.orgA akasci@fosstodon.org

      NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

      The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

      At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

      https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
      2/n

      alexadeswift@lgbtqia.spaceA This user is from outside of this forum
      alexadeswift@lgbtqia.spaceA This user is from outside of this forum
      alexadeswift@lgbtqia.space
      wrote sidst redigeret af
      #12

      @AkaSci

      May I hitch a lift please? You can drop me off at Luna ...

      1 Reply Last reply
      0
      • akasci@fosstodon.orgA akasci@fosstodon.org

        NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

        The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

        At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

        https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
        2/n

        genericperson@hachyderm.ioG This user is from outside of this forum
        genericperson@hachyderm.ioG This user is from outside of this forum
        genericperson@hachyderm.io
        wrote sidst redigeret af
        #13

        @AkaSci I might be a fan

        1 Reply Last reply
        0
        • akasci@fosstodon.orgA akasci@fosstodon.org

          NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

          The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

          At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

          https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
          2/n

          akasci@fosstodon.orgA This user is from outside of this forum
          akasci@fosstodon.orgA This user is from outside of this forum
          akasci@fosstodon.org
          wrote sidst redigeret af
          #14

          Knock knock!

          It is NASA’s crawler-transporter 2 arriving at the Vehicle Assembly Building at KSC for a pick-up!

          Tomorrow morning Jan. 17, at ~7 a.m. EST. it will transport NASA’s Space Launch System (SLS) rocket and Orion spacecraft + Mobile Launcher to Launch Pad 39B in preparation for the Artemis II crewed mission around the Moon on ~6 Feb.

          At about one mph, the four-mile journey will take 10-12 hours.

          Livestream starts at 7 a.m. at https://www.youtube.com/watch?v=nrVnsO_rdew

          https://www.nasa.gov/blogs/missions/2026/01/16/artemis-ii-moon-rocket-ready-for-big-move/
          3/n

          shadow@vmst.ioS akasci@fosstodon.orgA urwumpe@hessen.socialU pewnack@aus.socialP wtl@mastodon.socialW 5 Replies Last reply
          0
          • akasci@fosstodon.orgA akasci@fosstodon.org

            Knock knock!

            It is NASA’s crawler-transporter 2 arriving at the Vehicle Assembly Building at KSC for a pick-up!

            Tomorrow morning Jan. 17, at ~7 a.m. EST. it will transport NASA’s Space Launch System (SLS) rocket and Orion spacecraft + Mobile Launcher to Launch Pad 39B in preparation for the Artemis II crewed mission around the Moon on ~6 Feb.

            At about one mph, the four-mile journey will take 10-12 hours.

            Livestream starts at 7 a.m. at https://www.youtube.com/watch?v=nrVnsO_rdew

            https://www.nasa.gov/blogs/missions/2026/01/16/artemis-ii-moon-rocket-ready-for-big-move/
            3/n

            shadow@vmst.ioS This user is from outside of this forum
            shadow@vmst.ioS This user is from outside of this forum
            shadow@vmst.io
            wrote sidst redigeret af
            #15

            @AkaSci The crawler-transporter reminded me of No.5 lol

            1 Reply Last reply
            0
            • akasci@fosstodon.orgA akasci@fosstodon.org

              Knock knock!

              It is NASA’s crawler-transporter 2 arriving at the Vehicle Assembly Building at KSC for a pick-up!

              Tomorrow morning Jan. 17, at ~7 a.m. EST. it will transport NASA’s Space Launch System (SLS) rocket and Orion spacecraft + Mobile Launcher to Launch Pad 39B in preparation for the Artemis II crewed mission around the Moon on ~6 Feb.

              At about one mph, the four-mile journey will take 10-12 hours.

              Livestream starts at 7 a.m. at https://www.youtube.com/watch?v=nrVnsO_rdew

              https://www.nasa.gov/blogs/missions/2026/01/16/artemis-ii-moon-rocket-ready-for-big-move/
              3/n

              akasci@fosstodon.orgA This user is from outside of this forum
              akasci@fosstodon.orgA This user is from outside of this forum
              akasci@fosstodon.org
              wrote sidst redigeret af
              #16

              A pair of crawler-transporters (nicknamed “Hans” and “Franz”) were built in 1965 to move the massive Saturn V rocket from Kennedy’s VAB to Launch Complex 39. After the Moon landing and Skylab programs ended, the crawlers were used to transport the space shuttles.

              CT-2 was upgraded for the Artemis program around 2012.
              CT-1 was originally planned for commercial launch vehicles but its future remains uncertain.

              https://en.wikipedia.org/wiki/Crawler-transporter
              https://www.nasa.gov/humans-in-space/exploration-ground-systems/the-crawlers/
              4/n

              urwumpe@hessen.socialU akasci@fosstodon.orgA baloo@sfba.socialB 3 Replies Last reply
              0
              • akasci@fosstodon.orgA akasci@fosstodon.org

                Knock knock!

                It is NASA’s crawler-transporter 2 arriving at the Vehicle Assembly Building at KSC for a pick-up!

                Tomorrow morning Jan. 17, at ~7 a.m. EST. it will transport NASA’s Space Launch System (SLS) rocket and Orion spacecraft + Mobile Launcher to Launch Pad 39B in preparation for the Artemis II crewed mission around the Moon on ~6 Feb.

                At about one mph, the four-mile journey will take 10-12 hours.

                Livestream starts at 7 a.m. at https://www.youtube.com/watch?v=nrVnsO_rdew

                https://www.nasa.gov/blogs/missions/2026/01/16/artemis-ii-moon-rocket-ready-for-big-move/
                3/n

                urwumpe@hessen.socialU This user is from outside of this forum
                urwumpe@hessen.socialU This user is from outside of this forum
                urwumpe@hessen.social
                wrote sidst redigeret af
                #17

                @AkaSci Or 13:00 CET.

                Not sure if I will watch this, but its sure an rare event to see a crawler roll such a huge rocket out of the VAB.

                1 Reply Last reply
                0
                • akasci@fosstodon.orgA akasci@fosstodon.org

                  Knock knock!

                  It is NASA’s crawler-transporter 2 arriving at the Vehicle Assembly Building at KSC for a pick-up!

                  Tomorrow morning Jan. 17, at ~7 a.m. EST. it will transport NASA’s Space Launch System (SLS) rocket and Orion spacecraft + Mobile Launcher to Launch Pad 39B in preparation for the Artemis II crewed mission around the Moon on ~6 Feb.

                  At about one mph, the four-mile journey will take 10-12 hours.

                  Livestream starts at 7 a.m. at https://www.youtube.com/watch?v=nrVnsO_rdew

                  https://www.nasa.gov/blogs/missions/2026/01/16/artemis-ii-moon-rocket-ready-for-big-move/
                  3/n

                  pewnack@aus.socialP This user is from outside of this forum
                  pewnack@aus.socialP This user is from outside of this forum
                  pewnack@aus.social
                  wrote sidst redigeret af
                  #18

                  @AkaSci

                  Woah slow down there, speed demon!

                  1 Reply Last reply
                  0
                  • akasci@fosstodon.orgA akasci@fosstodon.org

                    A pair of crawler-transporters (nicknamed “Hans” and “Franz”) were built in 1965 to move the massive Saturn V rocket from Kennedy’s VAB to Launch Complex 39. After the Moon landing and Skylab programs ended, the crawlers were used to transport the space shuttles.

                    CT-2 was upgraded for the Artemis program around 2012.
                    CT-1 was originally planned for commercial launch vehicles but its future remains uncertain.

                    https://en.wikipedia.org/wiki/Crawler-transporter
                    https://www.nasa.gov/humans-in-space/exploration-ground-systems/the-crawlers/
                    4/n

                    urwumpe@hessen.socialU This user is from outside of this forum
                    urwumpe@hessen.socialU This user is from outside of this forum
                    urwumpe@hessen.social
                    wrote sidst redigeret af
                    #19

                    @AkaSci The add-on "Space Shuttle Vessel" for the Orbiter Spaceflight Simulator includes a pretty detailled simulation of the CT, permitting the player to drive the Space Shuttle onto the launch pad (or back again).

                    #Orbiter #opensource #foss #Spaceshuttle #spacesim

                    1 Reply Last reply
                    0
                    • akasci@fosstodon.orgA akasci@fosstodon.org

                      A pair of crawler-transporters (nicknamed “Hans” and “Franz”) were built in 1965 to move the massive Saturn V rocket from Kennedy’s VAB to Launch Complex 39. After the Moon landing and Skylab programs ended, the crawlers were used to transport the space shuttles.

                      CT-2 was upgraded for the Artemis program around 2012.
                      CT-1 was originally planned for commercial launch vehicles but its future remains uncertain.

                      https://en.wikipedia.org/wiki/Crawler-transporter
                      https://www.nasa.gov/humans-in-space/exploration-ground-systems/the-crawlers/
                      4/n

                      akasci@fosstodon.orgA This user is from outside of this forum
                      akasci@fosstodon.orgA This user is from outside of this forum
                      akasci@fosstodon.org
                      wrote sidst redigeret af
                      #20

                      Here are a few vital specs of the unique NASA crawler-transporter vehicles. No other vehicle comes close.

                      Each CT is larger than the size of a baseball infield and powered by locomotive and large electrical power generator engines.

                      The crawlers are designed to roll underneath the mobile launcher (ML) along with assembled rocket, pick it up, and steadily carry it 4.2 miles to Launch Pad 39B.

                      https://www3.nasa.gov/sites/default/files/atoms/files/combined_crawler-transporters_fact_sheet_final.pdf
                      5/n

                      akasci@fosstodon.orgA gunstick@mastodon.opencloud.luG 2 Replies Last reply
                      0
                      • akasci@fosstodon.orgA akasci@fosstodon.org

                        Here are a few vital specs of the unique NASA crawler-transporter vehicles. No other vehicle comes close.

                        Each CT is larger than the size of a baseball infield and powered by locomotive and large electrical power generator engines.

                        The crawlers are designed to roll underneath the mobile launcher (ML) along with assembled rocket, pick it up, and steadily carry it 4.2 miles to Launch Pad 39B.

                        https://www3.nasa.gov/sites/default/files/atoms/files/combined_crawler-transporters_fact_sheet_final.pdf
                        5/n

                        akasci@fosstodon.orgA This user is from outside of this forum
                        akasci@fosstodon.orgA This user is from outside of this forum
                        akasci@fosstodon.org
                        wrote sidst redigeret af
                        #21

                        The crawler-transporter is able to raise and lower its sides and corners independently using its hydraulic system. It uses its hydraulic suspension to keep the mobile platform and rocket level, as it climbs up the 2.9 degree slope to the the launch pad.

                        https://www3.nasa.gov/sites/default/files/atoms/files/combined_crawler-transporters_fact_sheet_final.pdf
                        More pics at https://images.nasa.gov/search?q=crawler&page=1&media=image,video,audio&yearStart=1920&yearEnd=2026
                        6/n

                        akasci@fosstodon.orgA 1 Reply Last reply
                        0
                        • akasci@fosstodon.orgA akasci@fosstodon.org

                          The crawler-transporter is able to raise and lower its sides and corners independently using its hydraulic system. It uses its hydraulic suspension to keep the mobile platform and rocket level, as it climbs up the 2.9 degree slope to the the launch pad.

                          https://www3.nasa.gov/sites/default/files/atoms/files/combined_crawler-transporters_fact_sheet_final.pdf
                          More pics at https://images.nasa.gov/search?q=crawler&page=1&media=image,video,audio&yearStart=1920&yearEnd=2026
                          6/n

                          akasci@fosstodon.orgA This user is from outside of this forum
                          akasci@fosstodon.orgA This user is from outside of this forum
                          akasci@fosstodon.org
                          wrote sidst redigeret af
                          #22

                          The NASA crawlers were built by the Marion Power Shovel Co., a manufacturer of steam shovels, power shovels and excavators. Their power shovels played a major role in mining, the construction of the Panama Canal and excavation of Hoover Dam and the Holland Tunnel.

                          The idea for a crawler-launcher platform started when a NASA engineer visited his father’s farm near Paradise, KY, and observed a giant strip mining shovel in operation.

                          https://pophistorydig.com/topics/tag/gem-of-egypt-shovel/
                          https://www.marionmade.org/2019/07/marion-power-shovel-nasa-crawler-transporter/
                          7/n

                          akasci@fosstodon.orgA 1 Reply Last reply
                          0
                          • akasci@fosstodon.orgA akasci@fosstodon.org

                            A pair of crawler-transporters (nicknamed “Hans” and “Franz”) were built in 1965 to move the massive Saturn V rocket from Kennedy’s VAB to Launch Complex 39. After the Moon landing and Skylab programs ended, the crawlers were used to transport the space shuttles.

                            CT-2 was upgraded for the Artemis program around 2012.
                            CT-1 was originally planned for commercial launch vehicles but its future remains uncertain.

                            https://en.wikipedia.org/wiki/Crawler-transporter
                            https://www.nasa.gov/humans-in-space/exploration-ground-systems/the-crawlers/
                            4/n

                            baloo@sfba.socialB This user is from outside of this forum
                            baloo@sfba.socialB This user is from outside of this forum
                            baloo@sfba.social
                            wrote sidst redigeret af
                            #23

                            @AkaSci Those things have so much of a thunderbirds smell!
                            (came out the same year)

                            1 Reply Last reply
                            0
                            • akasci@fosstodon.orgA akasci@fosstodon.org

                              The NASA crawlers were built by the Marion Power Shovel Co., a manufacturer of steam shovels, power shovels and excavators. Their power shovels played a major role in mining, the construction of the Panama Canal and excavation of Hoover Dam and the Holland Tunnel.

                              The idea for a crawler-launcher platform started when a NASA engineer visited his father’s farm near Paradise, KY, and observed a giant strip mining shovel in operation.

                              https://pophistorydig.com/topics/tag/gem-of-egypt-shovel/
                              https://www.marionmade.org/2019/07/marion-power-shovel-nasa-crawler-transporter/
                              7/n

                              akasci@fosstodon.orgA This user is from outside of this forum
                              akasci@fosstodon.orgA This user is from outside of this forum
                              akasci@fosstodon.org
                              wrote sidst redigeret af
                              #24

                              Here are a few videos of the NASA crawler-transporter in action in 2022 during the Artemis I mission.

                              https://www.youtube.com/watch?v=fhgPs0n3phc
                              https://www.youtube.com/watch?v=aBpHjQjbt2Q
                              https://www.youtube.com/watch?v=dk226QwT_1k
                              8/n

                              akasci@fosstodon.orgA 1 Reply Last reply
                              0
                              • akasci@fosstodon.orgA akasci@fosstodon.org

                                Here are a few videos of the NASA crawler-transporter in action in 2022 during the Artemis I mission.

                                https://www.youtube.com/watch?v=fhgPs0n3phc
                                https://www.youtube.com/watch?v=aBpHjQjbt2Q
                                https://www.youtube.com/watch?v=dk226QwT_1k
                                8/n

                                akasci@fosstodon.orgA This user is from outside of this forum
                                akasci@fosstodon.orgA This user is from outside of this forum
                                akasci@fosstodon.org
                                wrote sidst redigeret af
                                #25

                                Some amazing pics of NASA’s massive Artemis II SLS (Space Launch System) rocket and Orion spacecraft, secured to the mobile launcher, inside the Vehicle Assembly Building at KSC, taken on Friday, Jan. 16, 2026.

                                All work platforms have been retracted in preparation for rollout to Launch Complex 39B at KSC in FL Saturday morning.

                                More pics at https://images.nasa.gov/search?q=artemis%20ii%20sls&page=1&media=image,video,audio&yearStart=2026&yearEnd=2026
                                9/n

                                msbellows@c.imM akasci@fosstodon.orgA 2 Replies Last reply
                                0
                                • akasci@fosstodon.orgA akasci@fosstodon.org

                                  Some amazing pics of NASA’s massive Artemis II SLS (Space Launch System) rocket and Orion spacecraft, secured to the mobile launcher, inside the Vehicle Assembly Building at KSC, taken on Friday, Jan. 16, 2026.

                                  All work platforms have been retracted in preparation for rollout to Launch Complex 39B at KSC in FL Saturday morning.

                                  More pics at https://images.nasa.gov/search?q=artemis%20ii%20sls&page=1&media=image,video,audio&yearStart=2026&yearEnd=2026
                                  9/n

                                  msbellows@c.imM This user is from outside of this forum
                                  msbellows@c.imM This user is from outside of this forum
                                  msbellows@c.im
                                  wrote sidst redigeret af
                                  #26

                                  @AkaSci How do they move the rocket from the CT to the pad?

                                  akasci@fosstodon.orgA pixelpusher220@dmv.communityP 3 Replies Last reply
                                  0
                                  • msbellows@c.imM msbellows@c.im

                                    @AkaSci How do they move the rocket from the CT to the pad?

                                    akasci@fosstodon.orgA This user is from outside of this forum
                                    akasci@fosstodon.orgA This user is from outside of this forum
                                    akasci@fosstodon.org
                                    wrote sidst redigeret af
                                    #27

                                    @msbellows

                                    From https://www.nasa.gov/wp-content/uploads/2021/04/combined_crawler-transporters_fact_sheet_final.pdf -

                                    "Once the CT-2 makes its eight-hour trek to the pad with engineers and technicians aboard, ML1 and SLS will be lowered onto pad mount mechanisms. After platforms are lowered and power transfers are complete, the CT-2 will roll back down the pad slope and park just outside the pad perimeter gate. CT-2 will wait there until a few days prior to launch in case a rollback is required."

                                    Looking for a video ...

                                    pixelpusher220@dmv.communityP 1 Reply Last reply
                                    0
                                    • akasci@fosstodon.orgA akasci@fosstodon.org

                                      @msbellows

                                      From https://www.nasa.gov/wp-content/uploads/2021/04/combined_crawler-transporters_fact_sheet_final.pdf -

                                      "Once the CT-2 makes its eight-hour trek to the pad with engineers and technicians aboard, ML1 and SLS will be lowered onto pad mount mechanisms. After platforms are lowered and power transfers are complete, the CT-2 will roll back down the pad slope and park just outside the pad perimeter gate. CT-2 will wait there until a few days prior to launch in case a rollback is required."

                                      Looking for a video ...

                                      pixelpusher220@dmv.communityP This user is from outside of this forum
                                      pixelpusher220@dmv.communityP This user is from outside of this forum
                                      pixelpusher220@dmv.community
                                      wrote sidst redigeret af
                                      #28

                                      @AkaSci @msbellows I assume the crawler has a leveling mechanism for going up the pad slope while loaded?

                                      akasci@fosstodon.orgA 1 Reply Last reply
                                      0
                                      • msbellows@c.imM msbellows@c.im

                                        @AkaSci How do they move the rocket from the CT to the pad?

                                        pixelpusher220@dmv.communityP This user is from outside of this forum
                                        pixelpusher220@dmv.communityP This user is from outside of this forum
                                        pixelpusher220@dmv.community
                                        wrote sidst redigeret af
                                        #29

                                        @msbellows @AkaSci apparently no truth to the rumor they place a large hot air balloon over Congress, fill it with all the hot air and use that 🤪

                                        1 Reply Last reply
                                        0
                                        • pixelpusher220@dmv.communityP pixelpusher220@dmv.community

                                          @AkaSci @msbellows I assume the crawler has a leveling mechanism for going up the pad slope while loaded?

                                          akasci@fosstodon.orgA This user is from outside of this forum
                                          akasci@fosstodon.orgA This user is from outside of this forum
                                          akasci@fosstodon.org
                                          wrote sidst redigeret af
                                          #30

                                          @pixelpusher220 @msbellows
                                          Independent hydraulic suspensions along sides and corners, raised and lowered to keep the platform level at the pad slope.

                                          1 Reply Last reply
                                          0
                                          Svar
                                          • Svar som emne
                                          Login for at svare
                                          • Ældste til nyeste
                                          • Nyeste til ældste
                                          • Most Votes


                                          • Log ind

                                          • Har du ikke en konto? Tilmeld

                                          • Login or register to search.
                                          Powered by NodeBB Contributors
                                          Graciously hosted by data.coop
                                          • First post
                                            Last post
                                          0
                                          • Hjem
                                          • Seneste
                                          • Etiketter
                                          • Populære
                                          • Verden
                                          • Bruger
                                          • Grupper