Skip to content
  • Hjem
  • Seneste
  • Etiketter
  • Populære
  • Verden
  • Bruger
  • Grupper
Temaer
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Kollaps
FARVEL BIG TECH
  1. Forside
  2. Ikke-kategoriseret
  3. It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

Planlagt Fastgjort Låst Flyttet Ikke-kategoriseret
23 Indlæg 20 Posters 0 Visninger
  • Ældste til nyeste
  • Nyeste til ældste
  • Most Votes
Svar
  • Svar som emne
Login for at svare
Denne tråd er blevet slettet. Kun brugere med emne behandlings privilegier kan se den.
  • hzulla@infosec.exchangeH This user is from outside of this forum
    hzulla@infosec.exchangeH This user is from outside of this forum
    hzulla@infosec.exchange
    wrote sidst redigeret af
    #1

    It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

    https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

    tante@tldr.nettime.orgT knud@mastodon.socialK hzulla@infosec.exchangeH petealexharris@mastodon.scotP flyingpenguin@infosec.exchangeF 14 Replies Last reply
    1
    0
    • hzulla@infosec.exchangeH hzulla@infosec.exchange

      It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

      https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

      tante@tldr.nettime.orgT This user is from outside of this forum
      tante@tldr.nettime.orgT This user is from outside of this forum
      tante@tldr.nettime.org
      wrote sidst redigeret af
      #2

      @hzulla It's an interesting numbers game. Because you can calcultae the water usage in a way that it looks somewhat small, but a datacenter uses water _extremely locally_ which overloads supply

      jerrej@mastodon.socialJ 1 Reply Last reply
      0
      • hzulla@infosec.exchangeH hzulla@infosec.exchange

        It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

        https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

        knud@mastodon.socialK This user is from outside of this forum
        knud@mastodon.socialK This user is from outside of this forum
        knud@mastodon.social
        wrote sidst redigeret af
        #3

        @hzulla

        And can we please also talk about electricity use? The fallout is catastrophic.

        1 Reply Last reply
        0
        • hzulla@infosec.exchangeH hzulla@infosec.exchange

          It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

          https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

          hzulla@infosec.exchangeH This user is from outside of this forum
          hzulla@infosec.exchangeH This user is from outside of this forum
          hzulla@infosec.exchange
          wrote sidst redigeret af
          #4

          Another fun thing is remembering how the people who complained about EVs and heat pumps being an unreasonable burden on the grid's infrastructure are now the very same people betting on an obviously unrealistic goal of data center buildout FOMO that overwhelms both the local grid and the local water supply and will leave us with stranded assets of never completed or abandoned data center ruins.

          hzulla@infosec.exchangeH 1 Reply Last reply
          0
          • hzulla@infosec.exchangeH hzulla@infosec.exchange

            It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

            https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

            petealexharris@mastodon.scotP This user is from outside of this forum
            petealexharris@mastodon.scotP This user is from outside of this forum
            petealexharris@mastodon.scot
            wrote sidst redigeret af
            #5

            @hzulla
            Pass legislation to cap their usage *hard* at the level they say it will need on the planning request.

            Watch the planning requests get withdrawn, for totally unrelated reasons of course.

            1 Reply Last reply
            0
            • hzulla@infosec.exchangeH hzulla@infosec.exchange

              It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

              https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

              flyingpenguin@infosec.exchangeF This user is from outside of this forum
              flyingpenguin@infosec.exchangeF This user is from outside of this forum
              flyingpenguin@infosec.exchange
              wrote sidst redigeret af
              #6

              @hzulla my concern is that the lack of water is the plan. Trump and Putin are looking for foreign "migration hubs" to deport over 10 million people from America alone. These datacenter plans can pivot instantly to camps of forced deportation victims. That turns the no water, no energy into a feature.

              https://infosec.exchange/@lockdownsystems/116953933279054814

              1 Reply Last reply
              0
              • hzulla@infosec.exchangeH hzulla@infosec.exchange

                Another fun thing is remembering how the people who complained about EVs and heat pumps being an unreasonable burden on the grid's infrastructure are now the very same people betting on an obviously unrealistic goal of data center buildout FOMO that overwhelms both the local grid and the local water supply and will leave us with stranded assets of never completed or abandoned data center ruins.

                hzulla@infosec.exchangeH This user is from outside of this forum
                hzulla@infosec.exchangeH This user is from outside of this forum
                hzulla@infosec.exchange
                wrote sidst redigeret af
                #7

                There is a sign in the Prora Museum that mentions briefly how the planners and engineers of the Prora Nazi Holiday Resort knew that contemporary infrastructure technology was incapable to serve the planned massive building complex with the required services (fresh water, sewage, food, waste disposal, heating) if it were ever completed as depicted by Kraft durch Freude propaganda.

                They knew the project will fail the moment actual people were to use it at scale.

                But the mere fact of building and showing off a construction site was a propaganda success for leadership demonstrating will power.

                Nothing to learn from that for current events, I guess.

                illuminatus@mstdn.socialI tuban_muzuru@beige.partyT 2 Replies Last reply
                0
                • hzulla@infosec.exchangeH hzulla@infosec.exchange

                  It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

                  https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

                  pedramardakani@fosstodon.orgP This user is from outside of this forum
                  pedramardakani@fosstodon.orgP This user is from outside of this forum
                  pedramardakani@fosstodon.org
                  wrote sidst redigeret af
                  #8

                  @hzulla Ah, just learned how one can bypass the paywall. One method is using web archives. Now I can actully read the article: https://archive.ph/s1Aic

                  david_chisnall@infosec.exchangeD 1 Reply Last reply
                  0
                  • hzulla@infosec.exchangeH hzulla@infosec.exchange

                    There is a sign in the Prora Museum that mentions briefly how the planners and engineers of the Prora Nazi Holiday Resort knew that contemporary infrastructure technology was incapable to serve the planned massive building complex with the required services (fresh water, sewage, food, waste disposal, heating) if it were ever completed as depicted by Kraft durch Freude propaganda.

                    They knew the project will fail the moment actual people were to use it at scale.

                    But the mere fact of building and showing off a construction site was a propaganda success for leadership demonstrating will power.

                    Nothing to learn from that for current events, I guess.

                    illuminatus@mstdn.socialI This user is from outside of this forum
                    illuminatus@mstdn.socialI This user is from outside of this forum
                    illuminatus@mstdn.social
                    wrote sidst redigeret af
                    #9

                    @hzulla A bait-and-switch scheme. It only makes too much sense that the current iterations of it have gone leaner in the bait and speed up to the switch: everybody knows that fascism is a regime of murderous thieves, the fash know it also and don't really care to put the effort, because their "internal" cynicism about their "cause" has solidifed as much as everybody else's.

                    1 Reply Last reply
                    0
                    • hzulla@infosec.exchangeH hzulla@infosec.exchange

                      It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

                      https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

                      jaseg@chaos.socialJ This user is from outside of this forum
                      jaseg@chaos.socialJ This user is from outside of this forum
                      jaseg@chaos.social
                      wrote sidst redigeret af
                      #10

                      @hzulla I’m not a fan of data centers either, but both can be true. They tend to put these things in the middle of nowhere, places that previously had no large scale industrial users of water infrastructure.

                      1 Reply Last reply
                      0
                      • pedramardakani@fosstodon.orgP pedramardakani@fosstodon.org

                        @hzulla Ah, just learned how one can bypass the paywall. One method is using web archives. Now I can actully read the article: https://archive.ph/s1Aic

                        david_chisnall@infosec.exchangeD This user is from outside of this forum
                        david_chisnall@infosec.exchangeD This user is from outside of this forum
                        david_chisnall@infosec.exchange
                        wrote sidst redigeret af
                        #11

                        @pedramardakani @hzulla

                        Safari's 'hide distracting items' also works for this one. The article is rendered underneath the pop up, so you can just tell the browser to not render the pop up.

                        1 Reply Last reply
                        0
                        • hzulla@infosec.exchangeH hzulla@infosec.exchange

                          It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

                          https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

                          zed@mstdn.partyZ This user is from outside of this forum
                          zed@mstdn.partyZ This user is from outside of this forum
                          zed@mstdn.party
                          wrote sidst redigeret af
                          #12

                          @hzulla there’d be enough water if all the humans stop drinking it all !

                          1 Reply Last reply
                          0
                          • hzulla@infosec.exchangeH hzulla@infosec.exchange

                            It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

                            https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

                            primo@donphan.socialP This user is from outside of this forum
                            primo@donphan.socialP This user is from outside of this forum
                            primo@donphan.social
                            wrote sidst redigeret af
                            #13

                            @hzulla I knew that take had to be bollocks when people gave it shortly after the news dropping on an LLM Data center consuming water it didn't pay for.

                            1 Reply Last reply
                            0
                            • hzulla@infosec.exchangeH hzulla@infosec.exchange

                              It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

                              https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

                              osma@mas.toO This user is from outside of this forum
                              osma@mas.toO This user is from outside of this forum
                              osma@mas.to
                              wrote sidst redigeret af
                              #14

                              > In May, the company told MPs that some of these datacentres were requesting up to 3m litres of water a day, equivalent to the peak water demand of 3,500 homes.

                              Wtf is UK doing with water? 860 liters per day per home is a crazy figure!
                              @hzulla

                              nicovel0@mastodon.socialN 1 Reply Last reply
                              0
                              • osma@mas.toO osma@mas.to

                                > In May, the company told MPs that some of these datacentres were requesting up to 3m litres of water a day, equivalent to the peak water demand of 3,500 homes.

                                Wtf is UK doing with water? 860 liters per day per home is a crazy figure!
                                @hzulla

                                nicovel0@mastodon.socialN This user is from outside of this forum
                                nicovel0@mastodon.socialN This user is from outside of this forum
                                nicovel0@mastodon.social
                                wrote sidst redigeret af
                                #15

                                @osma @hzulla oh we don’t actually use it, Thames water leaks it all over the place.

                                1 Reply Last reply
                                0
                                • hzulla@infosec.exchangeH hzulla@infosec.exchange

                                  It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

                                  https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

                                  mahadevank@mastodon.socialM This user is from outside of this forum
                                  mahadevank@mastodon.socialM This user is from outside of this forum
                                  mahadevank@mastodon.social
                                  wrote sidst redigeret af
                                  #16

                                  @hzulla yeah, the stackoverflow guy(I forget his name) was also claiming the same thing right here on Mastodon

                                  1 Reply Last reply
                                  0
                                  • tante@tldr.nettime.orgT tante@tldr.nettime.org

                                    @hzulla It's an interesting numbers game. Because you can calcultae the water usage in a way that it looks somewhat small, but a datacenter uses water _extremely locally_ which overloads supply

                                    jerrej@mastodon.socialJ This user is from outside of this forum
                                    jerrej@mastodon.socialJ This user is from outside of this forum
                                    jerrej@mastodon.social
                                    wrote sidst redigeret af
                                    #17

                                    @tante @hzulla

                                    I always assumed datacentres would circulate their supply of coolant, which would probably double the power requirements but largely obviate their need for fresh water. Maybe they did, some thirty years ago when I visited a couple that were completely air-cooled and no where near bodies of water to dump their waste heat (and water) into?

                                    orva@social.orva.fiO 1 Reply Last reply
                                    0
                                    • hzulla@infosec.exchangeH hzulla@infosec.exchange

                                      There is a sign in the Prora Museum that mentions briefly how the planners and engineers of the Prora Nazi Holiday Resort knew that contemporary infrastructure technology was incapable to serve the planned massive building complex with the required services (fresh water, sewage, food, waste disposal, heating) if it were ever completed as depicted by Kraft durch Freude propaganda.

                                      They knew the project will fail the moment actual people were to use it at scale.

                                      But the mere fact of building and showing off a construction site was a propaganda success for leadership demonstrating will power.

                                      Nothing to learn from that for current events, I guess.

                                      tuban_muzuru@beige.partyT This user is from outside of this forum
                                      tuban_muzuru@beige.partyT This user is from outside of this forum
                                      tuban_muzuru@beige.party
                                      wrote sidst redigeret af
                                      #18

                                      @hzulla

                                      We successfully fought off a data center here in Menomonie, rural Wisconsin.

                                      The truth is uglier than the public propaganda: the data centers are being built on spec. The corporations are already starting to deal with each other, finding they've overbuilt.

                                      There will be some Big Losers in the not too distant future.

                                      1 Reply Last reply
                                      0
                                      • hzulla@infosec.exchangeH hzulla@infosec.exchange

                                        It's a fun contrast to see how AI apologists kept saying that criticism of data center water use is overblown, while the actual water utility companies loudly point out that data centers are a problem to the water supply.

                                        https://www.theguardian.com/environment/2026/jul/21/not-enough-water-for-uks-datacentre-plans-trade-body-says

                                        pri@cyberplace.socialP This user is from outside of this forum
                                        pri@cyberplace.socialP This user is from outside of this forum
                                        pri@cyberplace.social
                                        wrote sidst redigeret af
                                        #19

                                        @hzulla boohoo your giant datacenter doesnt have enough water. im more worried about how there are countries where people are dying of dehydration.

                                        1 Reply Last reply
                                        0
                                        • jerrej@mastodon.socialJ jerrej@mastodon.social

                                          @tante @hzulla

                                          I always assumed datacentres would circulate their supply of coolant, which would probably double the power requirements but largely obviate their need for fresh water. Maybe they did, some thirty years ago when I visited a couple that were completely air-cooled and no where near bodies of water to dump their waste heat (and water) into?

                                          orva@social.orva.fiO This user is from outside of this forum
                                          orva@social.orva.fiO This user is from outside of this forum
                                          orva@social.orva.fi
                                          wrote sidst redigeret af
                                          #20

                                          @jerrej @tante @hzulla AFAIK they have closed loop from servers to the cooling unit. The cooling unit transfers heat to a water supply which boils away, which cools the closed loop.

                                          jerrej@mastodon.socialJ 1 Reply Last reply
                                          0
                                          Svar
                                          • Svar som emne
                                          Login for at svare
                                          • Ældste til nyeste
                                          • Nyeste til ældste
                                          • Most Votes


                                          • Log ind

                                          • Har du ikke en konto? Tilmeld

                                          • Login or register to search.
                                          Powered by NodeBB Contributors
                                          Graciously hosted by data.coop
                                          • First post
                                            Last post
                                          0
                                          • Hjem
                                          • Seneste
                                          • Etiketter
                                          • Populære
                                          • Verden
                                          • Bruger
                                          • Grupper