Skip to content
  • Hjem
  • Seneste
  • Etiketter
  • Populære
  • Verden
  • Bruger
  • Grupper
Temaer
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Kollaps
FARVEL BIG TECH
  1. Forside
  2. Ikke-kategoriseret
  3. > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant.

> [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant.

Planlagt Fastgjort Låst Flyttet Ikke-kategoriseret
18 Indlæg 16 Posters 9 Visninger
  • Ældste til nyeste
  • Nyeste til ældste
  • Most Votes
Svar
  • Svar som emne
Login for at svare
Denne tråd er blevet slettet. Kun brugere med emne behandlings privilegier kan se den.
  • dcoderlt@ohai.socialD This user is from outside of this forum
    dcoderlt@ohai.socialD This user is from outside of this forum
    dcoderlt@ohai.social
    wrote sidst redigeret af
    #1

    > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

    > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

    https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

    #AI

    dcoderlt@ohai.socialD knapjack@social.vivaldi.netK amalia22@mastodon.socialA suehagley@mastoart.socialS cheappontoon@beige.partyC 13 Replies Last reply
    1
    0
    • dcoderlt@ohai.socialD dcoderlt@ohai.social

      > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

      > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

      https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

      #AI

      dcoderlt@ohai.socialD This user is from outside of this forum
      dcoderlt@ohai.socialD This user is from outside of this forum
      dcoderlt@ohai.social
      wrote sidst redigeret af
      #2

      To put 7.65 GW in context, Lithuania had a nuclear power plant generating 2.6 GW (and we shut it down twenty years ago).

      https://en.wikipedia.org/wiki/Ignalina_Nuclear_Power_Plant

      krnlg@mastodon.socialK niklasnisbeth@mastodon.xyzN 2 Replies Last reply
      0
      • dcoderlt@ohai.socialD dcoderlt@ohai.social

        > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

        > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

        https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

        #AI

        knapjack@social.vivaldi.netK This user is from outside of this forum
        knapjack@social.vivaldi.netK This user is from outside of this forum
        knapjack@social.vivaldi.net
        wrote sidst redigeret af
        #3

        @dcoderlt We need to start measuring them in flux capacitors.

        1 Reply Last reply
        0
        • dcoderlt@ohai.socialD dcoderlt@ohai.social

          > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

          > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

          https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

          #AI

          amalia22@mastodon.socialA This user is from outside of this forum
          amalia22@mastodon.socialA This user is from outside of this forum
          amalia22@mastodon.social
          wrote sidst redigeret af
          #4

          @dcoderlt While setting up a fund to prevent the extinction of certain species. Bunch of hypocrites. Slap and caress.

          1 Reply Last reply
          0
          • dcoderlt@ohai.socialD dcoderlt@ohai.social

            > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

            > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

            https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

            #AI

            suehagley@mastoart.socialS This user is from outside of this forum
            suehagley@mastoart.socialS This user is from outside of this forum
            suehagley@mastoart.social
            wrote sidst redigeret af
            #5

            @dcoderlt this is horrific, how is this allowed? Texas is in the firing line of the unfolding climate catastrophy

            frequencyfault@mastodon.socialF 1 Reply Last reply
            0
            • dcoderlt@ohai.socialD dcoderlt@ohai.social

              > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

              > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

              https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

              #AI

              cheappontoon@beige.partyC This user is from outside of this forum
              cheappontoon@beige.partyC This user is from outside of this forum
              cheappontoon@beige.party
              wrote sidst redigeret af
              #6

              @dcoderlt rich psychopaths

              1 Reply Last reply
              0
              • dcoderlt@ohai.socialD dcoderlt@ohai.social

                > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

                > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

                https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

                #AI

                ohmrun@indieweb.socialO This user is from outside of this forum
                ohmrun@indieweb.socialO This user is from outside of this forum
                ohmrun@indieweb.social
                wrote sidst redigeret af
                #7

                @dcoderlt

                1 Reply Last reply
                0
                • dcoderlt@ohai.socialD dcoderlt@ohai.social

                  > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

                  > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

                  https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

                  #AI

                  ar1@mastodon.socialA This user is from outside of this forum
                  ar1@mastodon.socialA This user is from outside of this forum
                  ar1@mastodon.social
                  wrote sidst redigeret af
                  #8

                  @dcoderlt theoretical question: would using a drone with semtex on it be considered self-defense? Or an infraction of T&C?

                  dss@infosec.exchangeD 1 Reply Last reply
                  0
                  • dcoderlt@ohai.socialD dcoderlt@ohai.social

                    > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

                    > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

                    https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

                    #AI

                    robabram@mas.toR This user is from outside of this forum
                    robabram@mas.toR This user is from outside of this forum
                    robabram@mas.to
                    wrote sidst redigeret af
                    #9

                    @dcoderlt "And, for an instant, she stared directly into those soft blue eyes and knew, with an instinctive mammalian certainty, that the exceedingly rich were no longer even remotely human." — William Gibson

                    1 Reply Last reply
                    0
                    • ar1@mastodon.socialA ar1@mastodon.social

                      @dcoderlt theoretical question: would using a drone with semtex on it be considered self-defense? Or an infraction of T&C?

                      dss@infosec.exchangeD This user is from outside of this forum
                      dss@infosec.exchangeD This user is from outside of this forum
                      dss@infosec.exchange
                      wrote sidst redigeret af
                      #10

                      @ar1 @dcoderlt Have you got Prime?

                      1 Reply Last reply
                      0
                      • dcoderlt@ohai.socialD dcoderlt@ohai.social

                        > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

                        > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

                        https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

                        #AI

                        dss@infosec.exchangeD This user is from outside of this forum
                        dss@infosec.exchangeD This user is from outside of this forum
                        dss@infosec.exchange
                        wrote sidst redigeret af
                        #11

                        @dcoderlt This is completely nuts. That's more than the entire power system of Texas!

                        1 Reply Last reply
                        0
                        • dcoderlt@ohai.socialD dcoderlt@ohai.social

                          > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

                          > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

                          https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

                          #AI

                          deedo@mastodon.nlD This user is from outside of this forum
                          deedo@mastodon.nlD This user is from outside of this forum
                          deedo@mastodon.nl
                          wrote sidst redigeret af
                          #12

                          @dcoderlt customers are just another natural resource to extract until dead.

                          1 Reply Last reply
                          0
                          • suehagley@mastoart.socialS suehagley@mastoart.social

                            @dcoderlt this is horrific, how is this allowed? Texas is in the firing line of the unfolding climate catastrophy

                            frequencyfault@mastodon.socialF This user is from outside of this forum
                            frequencyfault@mastodon.socialF This user is from outside of this forum
                            frequencyfault@mastodon.social
                            wrote sidst redigeret af
                            #13

                            @SueHagley @dcoderlt Texas and Florida are by far the two worst places in yhe world.

                            Worse than North Korea, Iran, Russia, and Saudi Arabia combined.

                            1 Reply Last reply
                            0
                            • dcoderlt@ohai.socialD dcoderlt@ohai.social

                              To put 7.65 GW in context, Lithuania had a nuclear power plant generating 2.6 GW (and we shut it down twenty years ago).

                              https://en.wikipedia.org/wiki/Ignalina_Nuclear_Power_Plant

                              krnlg@mastodon.socialK This user is from outside of this forum
                              krnlg@mastodon.socialK This user is from outside of this forum
                              krnlg@mastodon.social
                              wrote sidst redigeret af
                              #14

                              @dcoderlt Off topic but that nuclear plant looks so awesome!

                              1 Reply Last reply
                              0
                              • dcoderlt@ohai.socialD dcoderlt@ohai.social

                                > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

                                > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

                                https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

                                #AI

                                myphatself@mstdn.socialM This user is from outside of this forum
                                myphatself@mstdn.socialM This user is from outside of this forum
                                myphatself@mstdn.social
                                wrote sidst redigeret af
                                #15

                                @dcoderlt if you didnt already know, this IS war!

                                1 Reply Last reply
                                0
                                • dcoderlt@ohai.socialD dcoderlt@ohai.social

                                  > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

                                  > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

                                  https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

                                  #AI

                                  j12i@weirder.earthJ This user is from outside of this forum
                                  j12i@weirder.earthJ This user is from outside of this forum
                                  j12i@weirder.earth
                                  wrote sidst redigeret af
                                  #16

                                  boost with CN: "AI", fossil fuels

                                  1 Reply Last reply
                                  0
                                  • dcoderlt@ohai.socialD dcoderlt@ohai.social

                                    > [Amazon] has bought land and acquired permits in Pecos County, Texas, for an AI data center powered by a 7.65 gigawatt gas power plant. The plant will be completely separate from Texas’s power grid

                                    > The site, known as GW Ranch, got a state permit allowing the proposed power plant to emit 33 million tons of carbon dioxide, which would make it the biggest pollution site in the U.S., emitting more than the country’s biggest coal power plant

                                    https://newrepublic.com/post/214111/amazon-data-center-biggest-pollution-source-entire-country

                                    #AI

                                    lp0_on_fire@social.linux.pizzaL This user is from outside of this forum
                                    lp0_on_fire@social.linux.pizzaL This user is from outside of this forum
                                    lp0_on_fire@social.linux.pizza
                                    wrote sidst redigeret af
                                    #17

                                    @dcoderlt, sounds like a SPOF to me. What could possibly go wrong, etc.

                                    1 Reply Last reply
                                    0
                                    • dcoderlt@ohai.socialD dcoderlt@ohai.social

                                      To put 7.65 GW in context, Lithuania had a nuclear power plant generating 2.6 GW (and we shut it down twenty years ago).

                                      https://en.wikipedia.org/wiki/Ignalina_Nuclear_Power_Plant

                                      niklasnisbeth@mastodon.xyzN This user is from outside of this forum
                                      niklasnisbeth@mastodon.xyzN This user is from outside of this forum
                                      niklasnisbeth@mastodon.xyz
                                      wrote sidst redigeret af
                                      #18

                                      @dcoderlt To put 33 million tonnes of CO2 into perspective, my first online source says the average person emits 6 tonnes per year - so that's one powerplant powering one data center emitting the same amount of CO2 as everything that about 5 million people do?

                                      1 Reply Last reply
                                      0
                                      • pelle@veganism.socialP pelle@veganism.social shared this topic
                                      Svar
                                      • Svar som emne
                                      Login for at svare
                                      • Ældste til nyeste
                                      • Nyeste til ældste
                                      • Most Votes


                                      • Log ind

                                      • Har du ikke en konto? Tilmeld

                                      • Login or register to search.
                                      Powered by NodeBB Contributors
                                      Graciously hosted by data.coop
                                      • First post
                                        Last post
                                      0
                                      • Hjem
                                      • Seneste
                                      • Etiketter
                                      • Populære
                                      • Verden
                                      • Bruger
                                      • Grupper