Skip to content
  • Hjem
  • Seneste
  • Etiketter
  • Populære
  • Verden
  • Bruger
  • Grupper
Temaer
  • Light
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Kollaps
FARVEL BIG TECH
  1. Forside
  2. Ikke-kategoriseret
  3. The NASA Artemis II mission is targeted for launch as early as Feb.

The NASA Artemis II mission is targeted for launch as early as Feb.

Planlagt Fastgjort Låst Flyttet Ikke-kategoriseret
64 Indlæg 31 Posters 0 Visninger
  • Ældste til nyeste
  • Nyeste til ældste
  • Most Votes
Svar
  • Svar som emne
Login for at svare
Denne tråd er blevet slettet. Kun brugere med emne behandlings privilegier kan se den.
  • akasci@fosstodon.orgA This user is from outside of this forum
    akasci@fosstodon.orgA This user is from outside of this forum
    akasci@fosstodon.org
    wrote sidst redigeret af
    #1

    The NASA Artemis II mission is targeted for launch as early as Feb. 6.

    NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and CSA astronaut Jeremy Hansen will complete a 10-day journey around the Moon and back (no moon landing) to test systems and hardware, in preparation for future lunar landing missions.

    It will be the first crewed mission to the vicinity of the Moon since Apollo 17 in 1972.

    Launch vehicle: Space Launch System (SLS)
    Spacecraft: Orion

    https://www.nasa.gov/news-release/nasa-invites-media-to-cover-artemis-mission-from-johnson-space-center/
    1/n

    photo55@mastodon.socialP karlauerbach@sfba.socialK leeloo@chaosfem.twL hnapel@mastodon.socialH akasci@fosstodon.orgA 5 Replies Last reply
    0
    • akasci@fosstodon.orgA akasci@fosstodon.org

      The NASA Artemis II mission is targeted for launch as early as Feb. 6.

      NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and CSA astronaut Jeremy Hansen will complete a 10-day journey around the Moon and back (no moon landing) to test systems and hardware, in preparation for future lunar landing missions.

      It will be the first crewed mission to the vicinity of the Moon since Apollo 17 in 1972.

      Launch vehicle: Space Launch System (SLS)
      Spacecraft: Orion

      https://www.nasa.gov/news-release/nasa-invites-media-to-cover-artemis-mission-from-johnson-space-center/
      1/n

      photo55@mastodon.socialP This user is from outside of this forum
      photo55@mastodon.socialP This user is from outside of this forum
      photo55@mastodon.social
      wrote sidst redigeret af
      #2

      @AkaSci
      #Apollo 8
      The #sequel.

      1 Reply Last reply
      0
      • akasci@fosstodon.orgA akasci@fosstodon.org

        The NASA Artemis II mission is targeted for launch as early as Feb. 6.

        NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and CSA astronaut Jeremy Hansen will complete a 10-day journey around the Moon and back (no moon landing) to test systems and hardware, in preparation for future lunar landing missions.

        It will be the first crewed mission to the vicinity of the Moon since Apollo 17 in 1972.

        Launch vehicle: Space Launch System (SLS)
        Spacecraft: Orion

        https://www.nasa.gov/news-release/nasa-invites-media-to-cover-artemis-mission-from-johnson-space-center/
        1/n

        karlauerbach@sfba.socialK This user is from outside of this forum
        karlauerbach@sfba.socialK This user is from outside of this forum
        karlauerbach@sfba.social
        wrote sidst redigeret af
        #3

        @AkaSci Does the 2nd stage of the SLS system still have that ancillary internal combustion six cylinder piston motor that uses scavenged hydrogen and oxygen?

        1 Reply Last reply
        0
        • akasci@fosstodon.orgA akasci@fosstodon.org

          The NASA Artemis II mission is targeted for launch as early as Feb. 6.

          NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and CSA astronaut Jeremy Hansen will complete a 10-day journey around the Moon and back (no moon landing) to test systems and hardware, in preparation for future lunar landing missions.

          It will be the first crewed mission to the vicinity of the Moon since Apollo 17 in 1972.

          Launch vehicle: Space Launch System (SLS)
          Spacecraft: Orion

          https://www.nasa.gov/news-release/nasa-invites-media-to-cover-artemis-mission-from-johnson-space-center/
          1/n

          leeloo@chaosfem.twL This user is from outside of this forum
          leeloo@chaosfem.twL This user is from outside of this forum
          leeloo@chaosfem.tw
          wrote sidst redigeret af
          #4

          @AkaSci
          Perhaps move "(no landing)" after "around the moon" instead of after "and back"?

          1 Reply Last reply
          0
          • akasci@fosstodon.orgA akasci@fosstodon.org

            The NASA Artemis II mission is targeted for launch as early as Feb. 6.

            NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and CSA astronaut Jeremy Hansen will complete a 10-day journey around the Moon and back (no moon landing) to test systems and hardware, in preparation for future lunar landing missions.

            It will be the first crewed mission to the vicinity of the Moon since Apollo 17 in 1972.

            Launch vehicle: Space Launch System (SLS)
            Spacecraft: Orion

            https://www.nasa.gov/news-release/nasa-invites-media-to-cover-artemis-mission-from-johnson-space-center/
            1/n

            hnapel@mastodon.socialH This user is from outside of this forum
            hnapel@mastodon.socialH This user is from outside of this forum
            hnapel@mastodon.social
            wrote sidst redigeret af
            #5

            @AkaSci

            It's a hazardous journey and I'm glad I don't need to make it, this will be 10 days of nail biting, I wish them all the courage in the world.

            bouriquet@mastodon.socialB 1 Reply Last reply
            0
            • hnapel@mastodon.socialH hnapel@mastodon.social

              @AkaSci

              It's a hazardous journey and I'm glad I don't need to make it, this will be 10 days of nail biting, I wish them all the courage in the world.

              bouriquet@mastodon.socialB This user is from outside of this forum
              bouriquet@mastodon.socialB This user is from outside of this forum
              bouriquet@mastodon.social
              wrote sidst redigeret af
              #6

              @hnapel @AkaSci We did it successfully in the 1960s using stone knives and bearskins for equipment and computers by overthinking each and every situation, developing a culture of “failure is not an option”.
              May you walk in the footsteps of your predecessors. Tread carefully.

              1 Reply Last reply
              0
              • akasci@fosstodon.orgA akasci@fosstodon.org

                The NASA Artemis II mission is targeted for launch as early as Feb. 6.

                NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and CSA astronaut Jeremy Hansen will complete a 10-day journey around the Moon and back (no moon landing) to test systems and hardware, in preparation for future lunar landing missions.

                It will be the first crewed mission to the vicinity of the Moon since Apollo 17 in 1972.

                Launch vehicle: Space Launch System (SLS)
                Spacecraft: Orion

                https://www.nasa.gov/news-release/nasa-invites-media-to-cover-artemis-mission-from-johnson-space-center/
                1/n

                akasci@fosstodon.orgA This user is from outside of this forum
                akasci@fosstodon.orgA This user is from outside of this forum
                akasci@fosstodon.org
                wrote sidst redigeret af
                #7

                NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

                The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

                At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

                https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
                2/n

                f4grx@chaos.socialF enigma@norden.socialE jpshoer@mastodon.socialJ alexadeswift@lgbtqia.spaceA genericperson@hachyderm.ioG 6 Replies Last reply
                0
                • akasci@fosstodon.orgA akasci@fosstodon.org

                  NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

                  The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

                  At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

                  https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
                  2/n

                  f4grx@chaos.socialF This user is from outside of this forum
                  f4grx@chaos.socialF This user is from outside of this forum
                  f4grx@chaos.social
                  wrote sidst redigeret af
                  #8

                  @AkaSci careful when purging that oxygen tank!

                  1 Reply Last reply
                  0
                  • akasci@fosstodon.orgA akasci@fosstodon.org

                    NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

                    The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

                    At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

                    https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
                    2/n

                    enigma@norden.socialE This user is from outside of this forum
                    enigma@norden.socialE This user is from outside of this forum
                    enigma@norden.social
                    wrote sidst redigeret af
                    #9

                    @AkaSci Bremen is there in first row to pay attention 😎

                    axeln@norden.socialA 1 Reply Last reply
                    0
                    • enigma@norden.socialE enigma@norden.social

                      @AkaSci Bremen is there in first row to pay attention 😎

                      axeln@norden.socialA This user is from outside of this forum
                      axeln@norden.socialA This user is from outside of this forum
                      axeln@norden.social
                      wrote sidst redigeret af
                      #10

                      @enigma @AkaSci Go ESM!

                      1 Reply Last reply
                      0
                      • akasci@fosstodon.orgA akasci@fosstodon.org

                        NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

                        The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

                        At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

                        https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
                        2/n

                        jpshoer@mastodon.socialJ This user is from outside of this forum
                        jpshoer@mastodon.socialJ This user is from outside of this forum
                        jpshoer@mastodon.social
                        wrote sidst redigeret af
                        #11

                        @AkaSci My Artemis II launch date predictor tool -- which fits a line to (time remaining until announced launch date) vs. (date of announcement) and calculates the intercept -- is currently predicting 1 April 2026.

                        1 Reply Last reply
                        0
                        • akasci@fosstodon.orgA akasci@fosstodon.org

                          NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

                          The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

                          At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

                          https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
                          2/n

                          alexadeswift@lgbtqia.spaceA This user is from outside of this forum
                          alexadeswift@lgbtqia.spaceA This user is from outside of this forum
                          alexadeswift@lgbtqia.space
                          wrote sidst redigeret af
                          #12

                          @AkaSci

                          May I hitch a lift please? You can drop me off at Luna ...

                          1 Reply Last reply
                          0
                          • akasci@fosstodon.orgA akasci@fosstodon.org

                            NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

                            The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

                            At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

                            https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
                            2/n

                            genericperson@hachyderm.ioG This user is from outside of this forum
                            genericperson@hachyderm.ioG This user is from outside of this forum
                            genericperson@hachyderm.io
                            wrote sidst redigeret af
                            #13

                            @AkaSci I might be a fan

                            1 Reply Last reply
                            0
                            • akasci@fosstodon.orgA akasci@fosstodon.org

                              NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

                              The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

                              At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

                              https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
                              2/n

                              akasci@fosstodon.orgA This user is from outside of this forum
                              akasci@fosstodon.orgA This user is from outside of this forum
                              akasci@fosstodon.org
                              wrote sidst redigeret af
                              #14

                              Knock knock!

                              It is NASA’s crawler-transporter 2 arriving at the Vehicle Assembly Building at KSC for a pick-up!

                              Tomorrow morning Jan. 17, at ~7 a.m. EST. it will transport NASA’s Space Launch System (SLS) rocket and Orion spacecraft + Mobile Launcher to Launch Pad 39B in preparation for the Artemis II crewed mission around the Moon on ~6 Feb.

                              At about one mph, the four-mile journey will take 10-12 hours.

                              Livestream starts at 7 a.m. at https://www.youtube.com/watch?v=nrVnsO_rdew

                              https://www.nasa.gov/blogs/missions/2026/01/16/artemis-ii-moon-rocket-ready-for-big-move/
                              3/n

                              shadow@vmst.ioS akasci@fosstodon.orgA urwumpe@hessen.socialU pewnack@aus.socialP wtl@mastodon.socialW 5 Replies Last reply
                              0
                              • akasci@fosstodon.orgA akasci@fosstodon.org

                                Knock knock!

                                It is NASA’s crawler-transporter 2 arriving at the Vehicle Assembly Building at KSC for a pick-up!

                                Tomorrow morning Jan. 17, at ~7 a.m. EST. it will transport NASA’s Space Launch System (SLS) rocket and Orion spacecraft + Mobile Launcher to Launch Pad 39B in preparation for the Artemis II crewed mission around the Moon on ~6 Feb.

                                At about one mph, the four-mile journey will take 10-12 hours.

                                Livestream starts at 7 a.m. at https://www.youtube.com/watch?v=nrVnsO_rdew

                                https://www.nasa.gov/blogs/missions/2026/01/16/artemis-ii-moon-rocket-ready-for-big-move/
                                3/n

                                shadow@vmst.ioS This user is from outside of this forum
                                shadow@vmst.ioS This user is from outside of this forum
                                shadow@vmst.io
                                wrote sidst redigeret af
                                #15

                                @AkaSci The crawler-transporter reminded me of No.5 lol

                                1 Reply Last reply
                                0
                                • akasci@fosstodon.orgA akasci@fosstodon.org

                                  Knock knock!

                                  It is NASA’s crawler-transporter 2 arriving at the Vehicle Assembly Building at KSC for a pick-up!

                                  Tomorrow morning Jan. 17, at ~7 a.m. EST. it will transport NASA’s Space Launch System (SLS) rocket and Orion spacecraft + Mobile Launcher to Launch Pad 39B in preparation for the Artemis II crewed mission around the Moon on ~6 Feb.

                                  At about one mph, the four-mile journey will take 10-12 hours.

                                  Livestream starts at 7 a.m. at https://www.youtube.com/watch?v=nrVnsO_rdew

                                  https://www.nasa.gov/blogs/missions/2026/01/16/artemis-ii-moon-rocket-ready-for-big-move/
                                  3/n

                                  akasci@fosstodon.orgA This user is from outside of this forum
                                  akasci@fosstodon.orgA This user is from outside of this forum
                                  akasci@fosstodon.org
                                  wrote sidst redigeret af
                                  #16

                                  A pair of crawler-transporters (nicknamed “Hans” and “Franz”) were built in 1965 to move the massive Saturn V rocket from Kennedy’s VAB to Launch Complex 39. After the Moon landing and Skylab programs ended, the crawlers were used to transport the space shuttles.

                                  CT-2 was upgraded for the Artemis program around 2012.
                                  CT-1 was originally planned for commercial launch vehicles but its future remains uncertain.

                                  https://en.wikipedia.org/wiki/Crawler-transporter
                                  https://www.nasa.gov/humans-in-space/exploration-ground-systems/the-crawlers/
                                  4/n

                                  urwumpe@hessen.socialU akasci@fosstodon.orgA baloo@sfba.socialB 3 Replies Last reply
                                  0
                                  • akasci@fosstodon.orgA akasci@fosstodon.org

                                    Knock knock!

                                    It is NASA’s crawler-transporter 2 arriving at the Vehicle Assembly Building at KSC for a pick-up!

                                    Tomorrow morning Jan. 17, at ~7 a.m. EST. it will transport NASA’s Space Launch System (SLS) rocket and Orion spacecraft + Mobile Launcher to Launch Pad 39B in preparation for the Artemis II crewed mission around the Moon on ~6 Feb.

                                    At about one mph, the four-mile journey will take 10-12 hours.

                                    Livestream starts at 7 a.m. at https://www.youtube.com/watch?v=nrVnsO_rdew

                                    https://www.nasa.gov/blogs/missions/2026/01/16/artemis-ii-moon-rocket-ready-for-big-move/
                                    3/n

                                    urwumpe@hessen.socialU This user is from outside of this forum
                                    urwumpe@hessen.socialU This user is from outside of this forum
                                    urwumpe@hessen.social
                                    wrote sidst redigeret af
                                    #17

                                    @AkaSci Or 13:00 CET.

                                    Not sure if I will watch this, but its sure an rare event to see a crawler roll such a huge rocket out of the VAB.

                                    1 Reply Last reply
                                    0
                                    • akasci@fosstodon.orgA akasci@fosstodon.org

                                      Knock knock!

                                      It is NASA’s crawler-transporter 2 arriving at the Vehicle Assembly Building at KSC for a pick-up!

                                      Tomorrow morning Jan. 17, at ~7 a.m. EST. it will transport NASA’s Space Launch System (SLS) rocket and Orion spacecraft + Mobile Launcher to Launch Pad 39B in preparation for the Artemis II crewed mission around the Moon on ~6 Feb.

                                      At about one mph, the four-mile journey will take 10-12 hours.

                                      Livestream starts at 7 a.m. at https://www.youtube.com/watch?v=nrVnsO_rdew

                                      https://www.nasa.gov/blogs/missions/2026/01/16/artemis-ii-moon-rocket-ready-for-big-move/
                                      3/n

                                      pewnack@aus.socialP This user is from outside of this forum
                                      pewnack@aus.socialP This user is from outside of this forum
                                      pewnack@aus.social
                                      wrote sidst redigeret af
                                      #18

                                      @AkaSci

                                      Woah slow down there, speed demon!

                                      1 Reply Last reply
                                      0
                                      • akasci@fosstodon.orgA akasci@fosstodon.org

                                        A pair of crawler-transporters (nicknamed “Hans” and “Franz”) were built in 1965 to move the massive Saturn V rocket from Kennedy’s VAB to Launch Complex 39. After the Moon landing and Skylab programs ended, the crawlers were used to transport the space shuttles.

                                        CT-2 was upgraded for the Artemis program around 2012.
                                        CT-1 was originally planned for commercial launch vehicles but its future remains uncertain.

                                        https://en.wikipedia.org/wiki/Crawler-transporter
                                        https://www.nasa.gov/humans-in-space/exploration-ground-systems/the-crawlers/
                                        4/n

                                        urwumpe@hessen.socialU This user is from outside of this forum
                                        urwumpe@hessen.socialU This user is from outside of this forum
                                        urwumpe@hessen.social
                                        wrote sidst redigeret af
                                        #19

                                        @AkaSci The add-on "Space Shuttle Vessel" for the Orbiter Spaceflight Simulator includes a pretty detailled simulation of the CT, permitting the player to drive the Space Shuttle onto the launch pad (or back again).

                                        #Orbiter #opensource #foss #Spaceshuttle #spacesim

                                        1 Reply Last reply
                                        0
                                        • akasci@fosstodon.orgA akasci@fosstodon.org

                                          A pair of crawler-transporters (nicknamed “Hans” and “Franz”) were built in 1965 to move the massive Saturn V rocket from Kennedy’s VAB to Launch Complex 39. After the Moon landing and Skylab programs ended, the crawlers were used to transport the space shuttles.

                                          CT-2 was upgraded for the Artemis program around 2012.
                                          CT-1 was originally planned for commercial launch vehicles but its future remains uncertain.

                                          https://en.wikipedia.org/wiki/Crawler-transporter
                                          https://www.nasa.gov/humans-in-space/exploration-ground-systems/the-crawlers/
                                          4/n

                                          akasci@fosstodon.orgA This user is from outside of this forum
                                          akasci@fosstodon.orgA This user is from outside of this forum
                                          akasci@fosstodon.org
                                          wrote sidst redigeret af
                                          #20

                                          Here are a few vital specs of the unique NASA crawler-transporter vehicles. No other vehicle comes close.

                                          Each CT is larger than the size of a baseball infield and powered by locomotive and large electrical power generator engines.

                                          The crawlers are designed to roll underneath the mobile launcher (ML) along with assembled rocket, pick it up, and steadily carry it 4.2 miles to Launch Pad 39B.

                                          https://www3.nasa.gov/sites/default/files/atoms/files/combined_crawler-transporters_fact_sheet_final.pdf
                                          5/n

                                          akasci@fosstodon.orgA gunstick@mastodon.opencloud.luG 2 Replies Last reply
                                          0
                                          Svar
                                          • Svar som emne
                                          Login for at svare
                                          • Ældste til nyeste
                                          • Nyeste til ældste
                                          • Most Votes


                                          • Log ind

                                          • Har du ikke en konto? Tilmeld

                                          • Login or register to search.
                                          Powered by NodeBB Contributors
                                          Graciously hosted by data.coop
                                          • First post
                                            Last post
                                          0
                                          • Hjem
                                          • Seneste
                                          • Etiketter
                                          • Populære
                                          • Verden
                                          • Bruger
                                          • Grupper