Skip to content
  • Hjem
  • Seneste
  • Etiketter
  • Populære
  • Verden
  • Bruger
  • Grupper
Temaer
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Kollaps
FARVEL BIG TECH
  1. Forside
  2. Ikke-kategoriseret
  3. Welcome to the #LongestTrainEU #CrossBorderRail record breaking thread!

Welcome to the #LongestTrainEU #CrossBorderRail record breaking thread!

Planlagt Fastgjort Låst Flyttet Ikke-kategoriseret
longesttraineucrossborderrail
282 Indlæg 95 Posters 0 Visninger
  • Ældste til nyeste
  • Nyeste til ældste
  • Most Votes
Svar
  • Svar som emne
Login for at svare
Denne tråd er blevet slettet. Kun brugere med emne behandlings privilegier kan se den.
  • jon@gruene.socialJ jon@gruene.social

    Right then, this post outlines my options

    1) Change my rules, take the rail replacement bus, and do major re-planning, and lower risk connections

    2) Stick to my rules, and rely on tight connections later on in the journey

    Input welcome! I lean towards 2)

    https://crossborderrail.eu/messy-options-from-haparanda-to-hamburg/

    toxy@mastodon.acc.sunet.seT This user is from outside of this forum
    toxy@mastodon.acc.sunet.seT This user is from outside of this forum
    toxy@mastodon.acc.sunet.se
    wrote sidst redigeret af
    #149

    @jon 2. Stay pure.

    1 Reply Last reply
    0
    • jon@gruene.socialJ jon@gruene.social

      So I just called Norrtåg

      There is a power line down somewhere. If it is fixed in time, 7185 will be a train. If it is NOT fixed in time it will be a bus... 🤔

      So how bad is this power line failure?

      @sebwilken @tml @Jonas_Bostrom @stefanlindbohm

      nafmo@social.vivaldi.netN This user is from outside of this forum
      nafmo@social.vivaldi.netN This user is from outside of this forum
      nafmo@social.vivaldi.net
      wrote sidst redigeret af
      #150

      @jon @sebwilken @tml @Jonas_Bostrom @stefanlindbohm Those things take everything from a few hours to half a day to fix, down south where there are a lot of trains.

      Up north off the main lines, who knows. Depends how long they have to travel to get to the troubled spot.

      The rail replacement taxi will be in the Interrail system, so should be fine for the record attempt?

      Anyway, the worst timing possible...

      jon@gruene.socialJ 1 Reply Last reply
      0
      • gufo@mastodon.nuG gufo@mastodon.nu

        @jon OTOH this might be an unrelated fault: Murjek is west of Boden, so I guess it depends on whether Boden station has power or not. Tricky.

        jon@gruene.socialJ This user is from outside of this forum
        jon@gruene.socialJ This user is from outside of this forum
        jon@gruene.social
        wrote sidst redigeret af
        #151

        @gufo Right. That's what's hard to estimate!

        gufo@mastodon.nuG 1 Reply Last reply
        0
        • jon@gruene.socialJ jon@gruene.social

          @stefanlindbohm Is there any website that explains this in any way? If this were DB at least I would half know how serious it was!

          interrailinfosvenska@mastodonsweden.seI This user is from outside of this forum
          interrailinfosvenska@mastodonsweden.seI This user is from outside of this forum
          interrailinfosvenska@mastodonsweden.se
          wrote sidst redigeret af
          #152

          @jon A replacement bus is scheduled at 0741, it even shows the registration number. If you change your rules. https://www.trafikverket.se/trafikinformation/tag/?Train=7183-TR-5068-7181-20260908

          jon@gruene.socialJ 1 Reply Last reply
          0
          • interrailinfosvenska@mastodonsweden.seI interrailinfosvenska@mastodonsweden.se

            @jon A replacement bus is scheduled at 0741, it even shows the registration number. If you change your rules. https://www.trafikverket.se/trafikinformation/tag/?Train=7183-TR-5068-7181-20260908

            jon@gruene.socialJ This user is from outside of this forum
            jon@gruene.socialJ This user is from outside of this forum
            jon@gruene.social
            wrote sidst redigeret af
            #153

            @interrailinfosvenska Yes, I have that on the screens here!

            1 Reply Last reply
            0
            • jon@gruene.socialJ jon@gruene.social

              Most important: can any people even better versed in the mess of Swedish rail that me tell me what the chances are that Norrtåg 7185 Haparanda - Boden - Luleå is going to ALSO be replaced by a bus?

              It currently looks like it will be a train...

              @sebwilken @tml @Jonas_Bostrom @stefanlindbohm wdyt?

              nafmo@social.vivaldi.netN This user is from outside of this forum
              nafmo@social.vivaldi.netN This user is from outside of this forum
              nafmo@social.vivaldi.net
              wrote sidst redigeret af
              #154

              @jon @sebwilken @tml @Jonas_Bostrom @stefanlindbohm The inbound trip is listed as "await time", so the chances of it arriving Haparanda in time to turn around seem slim.

              1 Reply Last reply
              0
              • jon@gruene.socialJ jon@gruene.social

                @stefanlindbohm Has anything else left Boden I wonder?

                stefanlindbohm@mastodon.socialS This user is from outside of this forum
                stefanlindbohm@mastodon.socialS This user is from outside of this forum
                stefanlindbohm@mastodon.social
                wrote sidst redigeret af
                #155

                @jon There’s a SJ train schedules to leave just about now. But it arrived and departs from/to the south. So might not be affected depending on how the power sections are arranged.

                stefanlindbohm@mastodon.socialS 1 Reply Last reply
                0
                • nafmo@social.vivaldi.netN nafmo@social.vivaldi.net

                  @jon @sebwilken @tml @Jonas_Bostrom @stefanlindbohm Those things take everything from a few hours to half a day to fix, down south where there are a lot of trains.

                  Up north off the main lines, who knows. Depends how long they have to travel to get to the troubled spot.

                  The rail replacement taxi will be in the Interrail system, so should be fine for the record attempt?

                  Anyway, the worst timing possible...

                  jon@gruene.socialJ This user is from outside of this forum
                  jon@gruene.socialJ This user is from outside of this forum
                  jon@gruene.social
                  wrote sidst redigeret af
                  #156

                  @nafmo @sebwilken @tml @Jonas_Bostrom @stefanlindbohm but the problem is between Boden and Murjek: https://www.trafikverket.se/trafikinformation/meddelanden/?Counties=25&Filtertype=trainMessage The question then is WHERE, and if this impacts the small part of the track exiting Boden that the line to Haparanda takes?

                  tml@mementomori.socialT 1 Reply Last reply
                  0
                  • jon@gruene.socialJ jon@gruene.social

                    @gufo Right. That's what's hard to estimate!

                    gufo@mastodon.nuG This user is from outside of this forum
                    gufo@mastodon.nuG This user is from outside of this forum
                    gufo@mastodon.nu
                    wrote sidst redigeret af
                    #157

                    @jon Either way, it's the only power failure I can find documented, so it's likely this one — and with a long time to recovery. You may need to consider changing your rules, which opens the door for someone else to make a "clean" run (without emergency replacement traffic).

                    gufo@mastodon.nuG 1 Reply Last reply
                    0
                    • gufo@mastodon.nuG gufo@mastodon.nu

                      @jon Either way, it's the only power failure I can find documented, so it's likely this one — and with a long time to recovery. You may need to consider changing your rules, which opens the door for someone else to make a "clean" run (without emergency replacement traffic).

                      gufo@mastodon.nuG This user is from outside of this forum
                      gufo@mastodon.nuG This user is from outside of this forum
                      gufo@mastodon.nu
                      wrote sidst redigeret af
                      #158

                      @jon I don't envy that decision 😕

                      1 Reply Last reply
                      0
                      • jon@gruene.socialJ jon@gruene.social

                        @nafmo @sebwilken @tml @Jonas_Bostrom @stefanlindbohm but the problem is between Boden and Murjek: https://www.trafikverket.se/trafikinformation/meddelanden/?Counties=25&Filtertype=trainMessage The question then is WHERE, and if this impacts the small part of the track exiting Boden that the line to Haparanda takes?

                        tml@mementomori.socialT This user is from outside of this forum
                        tml@mementomori.socialT This user is from outside of this forum
                        tml@mementomori.social
                        wrote sidst redigeret af
                        #159

                        @jon @nafmo @sebwilken @Jonas_Bostrom @stefanlindbohm Well, I guess if Trafikverket says they need the whole line Boden–Murjek for urgent maintenance, Norrtåg can not say "but we only need to use it for a couple of kilometres a couple of times per day pretty please!?" Ordnung muss sein! Safety First!

                        nafmo@social.vivaldi.netN jonas_bostrom@mastodonsweden.seJ 2 Replies Last reply
                        0
                        • jon@gruene.socialJ jon@gruene.social

                          So I just called Norrtåg

                          There is a power line down somewhere. If it is fixed in time, 7185 will be a train. If it is NOT fixed in time it will be a bus... 🤔

                          So how bad is this power line failure?

                          @sebwilken @tml @Jonas_Bostrom @stefanlindbohm

                          jon@gruene.socialJ This user is from outside of this forum
                          jon@gruene.socialJ This user is from outside of this forum
                          jon@gruene.social
                          wrote sidst redigeret af
                          #160

                          Trains *are* running in Boden 😄 https://www.trafikverket.se/trafikinformation/tag/?Station=Boden+C&ArrDep=departure

                          gufo@mastodon.nuG jon@gruene.socialJ 2 Replies Last reply
                          0
                          • tml@mementomori.socialT tml@mementomori.social

                            @jon @nafmo @sebwilken @Jonas_Bostrom @stefanlindbohm Well, I guess if Trafikverket says they need the whole line Boden–Murjek for urgent maintenance, Norrtåg can not say "but we only need to use it for a couple of kilometres a couple of times per day pretty please!?" Ordnung muss sein! Safety First!

                            nafmo@social.vivaldi.netN This user is from outside of this forum
                            nafmo@social.vivaldi.netN This user is from outside of this forum
                            nafmo@social.vivaldi.net
                            wrote sidst redigeret af
                            #161

                            @tml @jon @sebwilken @Jonas_Bostrom @stefanlindbohm Maybe the trains they need to run there are stuck on the wrong branch line?

                            Interestingly, Haparanda is not listed as an impacted station on Trafikverket's page, so it didn't really make sense

                            nafmo@social.vivaldi.netN jon@gruene.socialJ 2 Replies Last reply
                            0
                            • nafmo@social.vivaldi.netN nafmo@social.vivaldi.net

                              @tml @jon @sebwilken @Jonas_Bostrom @stefanlindbohm Maybe the trains they need to run there are stuck on the wrong branch line?

                              Interestingly, Haparanda is not listed as an impacted station on Trafikverket's page, so it didn't really make sense

                              nafmo@social.vivaldi.netN This user is from outside of this forum
                              nafmo@social.vivaldi.netN This user is from outside of this forum
                              nafmo@social.vivaldi.net
                              wrote sidst redigeret af
                              #162

                              @tml @jon @sebwilken @Jonas_Bostrom @stefanlindbohm If I look up Boden, the problem is listed there, with a prognosis of being fixed night to Wednesday...

                              1 Reply Last reply
                              0
                              • jon@gruene.socialJ jon@gruene.social

                                Welcome to the #LongestTrainEU #CrossBorderRail record breaking thread!

                                This train journey starts in Kemijärvi 🇫🇮 and ends in Lagos 🇵🇹

                                18 trains, 100 hours 9 minutes, 4008km as the crow flies, 6281 route-km

                                The background to this project is here:
                                https://longestjourney.crossborderrail.eu/

                                And the live tracking throughout is here:
                                https://longestjourneylive.crossborderrail.eu/

                                paszau@mastodon.onlineP This user is from outside of this forum
                                paszau@mastodon.onlineP This user is from outside of this forum
                                paszau@mastodon.online
                                wrote sidst redigeret af
                                #163

                                @jon

                                I did do Oulu (finland) to Calpe (spain) this summer with bus, train and ship in a three days journey. Bus mostly so I could create a tighter schedule and avoid busy Barcelona.

                                I see you ran already into some problems. 😞 I hope they resolve fast! Good luck!

                                1 Reply Last reply
                                0
                                • jon@gruene.socialJ jon@gruene.social

                                  Can some Finn please explain this road sign seen in Kemijärvi earlier?

                                  Is it "you will only hit elk on the roads in half of Finland"? Is there some elk wall across the middle of the country?

                                  EDIT: OK, it's a reindeer herding area

                                  But I have questions!

                                  The antlers on that sign are wrong.

                                  And given I was a LONG way into the area, why do I need the map?

                                  useravoiding@mastodon.socialU This user is from outside of this forum
                                  useravoiding@mastodon.socialU This user is from outside of this forum
                                  useravoiding@mastodon.social
                                  wrote sidst redigeret af
                                  #164

                                  @jon About the reindeer herding area: they are semi-domesticated. Meaning they have a owner but roam freely. They aren't afraid of humans like wild animals and sometimes they hang around on roads. This is a risk because they won't flee when disturbed so if you go by car you have to stop and wait for them to move out of your way and you're not allowed to scare them off the road.

                                  1 Reply Last reply
                                  0
                                  • nafmo@social.vivaldi.netN nafmo@social.vivaldi.net

                                    @tml @jon @sebwilken @Jonas_Bostrom @stefanlindbohm Maybe the trains they need to run there are stuck on the wrong branch line?

                                    Interestingly, Haparanda is not listed as an impacted station on Trafikverket's page, so it didn't really make sense

                                    jon@gruene.socialJ This user is from outside of this forum
                                    jon@gruene.socialJ This user is from outside of this forum
                                    jon@gruene.social
                                    wrote sidst redigeret af
                                    #165

                                    @nafmo @tml @sebwilken @Jonas_Bostrom @stefanlindbohm No, Haparanda - Luleå is one train going back and forth. So ought to be OK.

                                    1 Reply Last reply
                                    0
                                    • jon@gruene.socialJ jon@gruene.social

                                      Trains *are* running in Boden 😄 https://www.trafikverket.se/trafikinformation/tag/?Station=Boden+C&ArrDep=departure

                                      gufo@mastodon.nuG This user is from outside of this forum
                                      gufo@mastodon.nuG This user is from outside of this forum
                                      gufo@mastodon.nu
                                      wrote sidst redigeret af
                                      #166

                                      @jon At least the southbound part of Boden C seems operational, yes.

                                      94 is the Stockholm-Luleå sleeper.
                                      7103 is Norrtåg Luleå-Umeå.

                                      1 Reply Last reply
                                      0
                                      • stefanlindbohm@mastodon.socialS stefanlindbohm@mastodon.social

                                        @jon There’s a SJ train schedules to leave just about now. But it arrived and departs from/to the south. So might not be affected depending on how the power sections are arranged.

                                        stefanlindbohm@mastodon.socialS This user is from outside of this forum
                                        stefanlindbohm@mastodon.socialS This user is from outside of this forum
                                        stefanlindbohm@mastodon.social
                                        wrote sidst redigeret af
                                        #167

                                        @jon It did depart, but I don’t think that tells us anything.

                                        I found a cab view video out of Boden and there’s a power section sign just north before Haparandabanan branches off. This and the fact that Trafikverket only has this one disruption listed which is matching the electrical fault. I would think it’s the correct one.

                                        jon@gruene.socialJ 1 Reply Last reply
                                        0
                                        • jon@gruene.socialJ jon@gruene.social

                                          Trains *are* running in Boden 😄 https://www.trafikverket.se/trafikinformation/tag/?Station=Boden+C&ArrDep=departure

                                          jon@gruene.socialJ This user is from outside of this forum
                                          jon@gruene.socialJ This user is from outside of this forum
                                          jon@gruene.social
                                          wrote sidst redigeret af
                                          #168

                                          And if you look at the data for Boden the "Elfel" (electric fault) is only towards Kiruna

                                          I reckon 7185 *could* run, if Norrtåg wants it to. Let's see if they want it to run!

                                          https://www.trafikverket.se/trafikinformation/tag/?Station=Boden+C&ArrDep=departure

                                          gufo@mastodon.nuG jon@gruene.socialJ 2 Replies Last reply
                                          0
                                          Svar
                                          • Svar som emne
                                          Login for at svare
                                          • Ældste til nyeste
                                          • Nyeste til ældste
                                          • Most Votes


                                          • Log ind

                                          • Har du ikke en konto? Tilmeld

                                          • Login or register to search.
                                          Powered by NodeBB Contributors
                                          Graciously hosted by data.coop
                                          • First post
                                            Last post
                                          0
                                          • Hjem
                                          • Seneste
                                          • Etiketter
                                          • Populære
                                          • Verden
                                          • Bruger
                                          • Grupper