Skip to content
  • Hjem
  • Seneste
  • Etiketter
  • Populære
  • Verden
  • Bruger
  • Grupper
Temaer
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Kollaps
FARVEL BIG TECH
  1. Forside
  2. Ikke-kategoriseret
  3. Welcome to the #LongestTrainEU #CrossBorderRail record breaking thread!

Welcome to the #LongestTrainEU #CrossBorderRail record breaking thread!

Planlagt Fastgjort Låst Flyttet Ikke-kategoriseret
longesttraineucrossborderrail
282 Indlæg 95 Posters 0 Visninger
  • Ældste til nyeste
  • Nyeste til ældste
  • Most Votes
Svar
  • Svar som emne
Login for at svare
Denne tråd er blevet slettet. Kun brugere med emne behandlings privilegier kan se den.
  • sobex@social.sciences.reS sobex@social.sciences.re

    @jon @taavi @bovine3dom @stefanlindbohm But that's against the rules of a rail journey record, right ?

    bovine3dom@masto.aiB This user is from outside of this forum
    bovine3dom@masto.aiB This user is from outside of this forum
    bovine3dom@masto.ai
    wrote sidst redigeret af
    #224

    @Sobex the rules say nothing about the means of transport you need to use for strategic retreats

    @jon @taavi @stefanlindbohm

    jon@gruene.socialJ 1 Reply Last reply
    0
    • bovine3dom@masto.aiB bovine3dom@masto.ai

      @Sobex the rules say nothing about the means of transport you need to use for strategic retreats

      @jon @taavi @stefanlindbohm

      jon@gruene.socialJ This user is from outside of this forum
      jon@gruene.socialJ This user is from outside of this forum
      jon@gruene.social
      wrote sidst redigeret af
      #225

      @bovine3dom @Sobex @taavi @stefanlindbohm right. But as stated, I don’t know if it’d work!

      1 Reply Last reply
      0
      • jon@gruene.socialJ jon@gruene.social

        @bovine3dom @Sobex @stefanlindbohm if I knew *for sure* that the Haparanda - Boden would run tomorrow morning, maybe that is not the worst idea. But I don't know that for sure, so it is too risky!

        stefanlindbohm@mastodon.socialS This user is from outside of this forum
        stefanlindbohm@mastodon.socialS This user is from outside of this forum
        stefanlindbohm@mastodon.social
        wrote sidst redigeret af
        #226

        @jon Stats on the link below. I don’t think this page differentiates train not even scheduled from train cancelled (there have been track works this year that I assume explains many days not running), but despite some frequent delays it looks like at least outright cancellations are uncommon.

        Since the cause was an overhead wire torn down by another train, it’s not specifically a systemic issue here.

        I don’t dare making a judgement call though.

        https://statistik.xn--tgexperterna-tcb.nu/punktlighet/7183

        @bovine3dom @Sobex

        bovine3dom@masto.aiB 1 Reply Last reply
        0
        • jon@gruene.socialJ jon@gruene.social

          Looks like the 13:47 Haparanda - Boden is *also* cancelled So I *might* be able to leave Haparanda at 19:38, and then get the night train at 22:18 from Boden

          So I *might* be able to leave Haparanda at 19:38, and then get the night train at 22:18 from Boden to Stockholm - have reserved a (cancellable) bed on that in case it does work 🙂

          sebwilken@mastodon.socialS This user is from outside of this forum
          sebwilken@mastodon.socialS This user is from outside of this forum
          sebwilken@mastodon.social
          wrote sidst redigeret af
          #227

          @jon Swedish night trains work really well with Interrail, I‘ll give them that.

          jon@gruene.socialJ 1 Reply Last reply
          0
          • tml@mementomori.socialT tml@mementomori.social

            @jon @nafmo @sebwilken @Jonas_Bostrom @stefanlindbohm Well, I guess if Trafikverket says they need the whole line Boden–Murjek for urgent maintenance, Norrtåg can not say "but we only need to use it for a couple of kilometres a couple of times per day pretty please!?" Ordnung muss sein! Safety First!

            jonas_bostrom@mastodonsweden.seJ This user is from outside of this forum
            jonas_bostrom@mastodonsweden.seJ This user is from outside of this forum
            jonas_bostrom@mastodonsweden.se
            wrote sidst redigeret af
            #228

            @tml @jon @nafmo @sebwilken @stefanlindbohm Once upon a time, Haparandabanan had it's own exit from Boden. Things don't always improve. https://www.youtube.com/watch?v=IK6i7KZiE6s

            stefanlindbohm@mastodon.socialS tml@mementomori.socialT 2 Replies Last reply
            0
            • hopla@zug.networkH hopla@zug.network

              @jon Oh gosh.. and Sweden doesn't strike me as the country who neglects railway infrastructure, there's so much more to possibly happen but I didn't expect the first hiccup that early into the adventure! This is interesting and thrilling

              stefanlindbohm@mastodon.socialS This user is from outside of this forum
              stefanlindbohm@mastodon.socialS This user is from outside of this forum
              stefanlindbohm@mastodon.social
              wrote sidst redigeret af
              #229

              @hopla @jon Our maintenance deficit was calculated to something like 150 years to catch up on, excluding new maintenance that will be needed during those 150 years 😅😅

              1 Reply Last reply
              0
              • jonas_bostrom@mastodonsweden.seJ jonas_bostrom@mastodonsweden.se

                @tml @jon @nafmo @sebwilken @stefanlindbohm Once upon a time, Haparandabanan had it's own exit from Boden. Things don't always improve. https://www.youtube.com/watch?v=IK6i7KZiE6s

                stefanlindbohm@mastodon.socialS This user is from outside of this forum
                stefanlindbohm@mastodon.socialS This user is from outside of this forum
                stefanlindbohm@mastodon.social
                wrote sidst redigeret af
                #230

                @Jonas_Bostrom This is the video I used to locate the power section boards and figure out that it’s using the same power section to Murjek 😅

                jonas_bostrom@mastodonsweden.seJ 1 Reply Last reply
                0
                • stefanlindbohm@mastodon.socialS stefanlindbohm@mastodon.social

                  @jon Stats on the link below. I don’t think this page differentiates train not even scheduled from train cancelled (there have been track works this year that I assume explains many days not running), but despite some frequent delays it looks like at least outright cancellations are uncommon.

                  Since the cause was an overhead wire torn down by another train, it’s not specifically a systemic issue here.

                  I don’t dare making a judgement call though.

                  https://statistik.xn--tgexperterna-tcb.nu/punktlighet/7183

                  @bovine3dom @Sobex

                  bovine3dom@masto.aiB This user is from outside of this forum
                  bovine3dom@masto.aiB This user is from outside of this forum
                  bovine3dom@masto.ai
                  wrote sidst redigeret af
                  #231

                  @stefanlindbohm ooh punycode. don't see that often in europe

                  1 Reply Last reply
                  0
                  • jonas_bostrom@mastodonsweden.seJ jonas_bostrom@mastodonsweden.se

                    @tml @jon @nafmo @sebwilken @stefanlindbohm Once upon a time, Haparandabanan had it's own exit from Boden. Things don't always improve. https://www.youtube.com/watch?v=IK6i7KZiE6s

                    tml@mementomori.socialT This user is from outside of this forum
                    tml@mementomori.socialT This user is from outside of this forum
                    tml@mementomori.social
                    wrote sidst redigeret af
                    #232

                    @Jonas_Bostrom @jon @nafmo @sebwilken @stefanlindbohm Wow, that was a weird solution. The line to Haparanda was on the *left* when leaving Boden and had to curve around and pass over Malmbanan on a bridge. Or did I misunderstand?

                    stefanlindbohm@mastodon.socialS violanders@mastodon.nuV 2 Replies Last reply
                    0
                    • stefanlindbohm@mastodon.socialS stefanlindbohm@mastodon.social

                      @Jonas_Bostrom This is the video I used to locate the power section boards and figure out that it’s using the same power section to Murjek 😅

                      jonas_bostrom@mastodonsweden.seJ This user is from outside of this forum
                      jonas_bostrom@mastodonsweden.seJ This user is from outside of this forum
                      jonas_bostrom@mastodonsweden.se
                      wrote sidst redigeret af
                      #233

                      @stefanlindbohm Hyttfilmer kan vara användbara till både det ena och det andra!

                      1 Reply Last reply
                      0
                      • tml@mementomori.socialT tml@mementomori.social

                        @Jonas_Bostrom @jon @nafmo @sebwilken @stefanlindbohm Wow, that was a weird solution. The line to Haparanda was on the *left* when leaving Boden and had to curve around and pass over Malmbanan on a bridge. Or did I misunderstand?

                        stefanlindbohm@mastodon.socialS This user is from outside of this forum
                        stefanlindbohm@mastodon.socialS This user is from outside of this forum
                        stefanlindbohm@mastodon.social
                        wrote sidst redigeret af
                        #234

                        @tml @Jonas_Bostrom I also found that a bit odd. Presumably because the platforms are by the leftmost tracks at Boden C station?

                        jonas_bostrom@mastodonsweden.seJ 1 Reply Last reply
                        0
                        • sebwilken@mastodon.socialS sebwilken@mastodon.social

                          @jon Swedish night trains work really well with Interrail, I‘ll give them that.

                          jon@gruene.socialJ This user is from outside of this forum
                          jon@gruene.socialJ This user is from outside of this forum
                          jon@gruene.social
                          wrote sidst redigeret af
                          #235

                          @sebwilken Right, and that tickets can all be cancelled right up to the last minute!

                          1 Reply Last reply
                          0
                          • stefanlindbohm@mastodon.socialS stefanlindbohm@mastodon.social

                            @tml @Jonas_Bostrom I also found that a bit odd. Presumably because the platforms are by the leftmost tracks at Boden C station?

                            jonas_bostrom@mastodonsweden.seJ This user is from outside of this forum
                            jonas_bostrom@mastodonsweden.seJ This user is from outside of this forum
                            jonas_bostrom@mastodonsweden.se
                            wrote sidst redigeret af
                            #236

                            @stefanlindbohm @tml Det stämmer, och det var en väldigt udda lösning. Min gissning är att det var för att tågen från Haparanda skulle kunna ta sig till perrongerna utan att störa trafiken på Malmbanan.

                            1 Reply Last reply
                            0
                            • jon@gruene.socialJ jon@gruene.social

                              Looks like the 13:47 Haparanda - Boden is *also* cancelled So I *might* be able to leave Haparanda at 19:38, and then get the night train at 22:18 from Boden

                              So I *might* be able to leave Haparanda at 19:38, and then get the night train at 22:18 from Boden to Stockholm - have reserved a (cancellable) bed on that in case it does work 🙂

                              ottermiemuis@waag.socialO This user is from outside of this forum
                              ottermiemuis@waag.socialO This user is from outside of this forum
                              ottermiemuis@waag.social
                              wrote sidst redigeret af
                              #237

                              @jon +waves pompoms+ 🚂

                              1 Reply Last reply
                              0
                              • tml@mementomori.socialT tml@mementomori.social

                                @Jonas_Bostrom @jon @nafmo @sebwilken @stefanlindbohm Wow, that was a weird solution. The line to Haparanda was on the *left* when leaving Boden and had to curve around and pass over Malmbanan on a bridge. Or did I misunderstand?

                                violanders@mastodon.nuV This user is from outside of this forum
                                violanders@mastodon.nuV This user is from outside of this forum
                                violanders@mastodon.nu
                                wrote sidst redigeret af
                                #238

                                @tml @Jonas_Bostrom @jon @nafmo @sebwilken @stefanlindbohm It would have made more sense if the line between Boden C and the junction had been double track.

                                violanders@mastodon.nuV 1 Reply Last reply
                                0
                                • violanders@mastodon.nuV violanders@mastodon.nu

                                  @tml @Jonas_Bostrom @jon @nafmo @sebwilken @stefanlindbohm It would have made more sense if the line between Boden C and the junction had been double track.

                                  violanders@mastodon.nuV This user is from outside of this forum
                                  violanders@mastodon.nuV This user is from outside of this forum
                                  violanders@mastodon.nu
                                  wrote sidst redigeret af
                                  #239

                                  @tml @Jonas_Bostrom @jon @nafmo @sebwilken @stefanlindbohm My bad - it was double track! The Haparanda line was unelectrified.

                                  jonas_bostrom@mastodonsweden.seJ 1 Reply Last reply
                                  0
                                  • jon@gruene.socialJ jon@gruene.social

                                    And why there is a 6 finger hand on the train door, thanks to @saruwine - 2006 article https://yle.fi/aihe/a/20-24799

                                    ottermiemuis@waag.socialO This user is from outside of this forum
                                    ottermiemuis@waag.socialO This user is from outside of this forum
                                    ottermiemuis@waag.social
                                    wrote sidst redigeret af
                                    #240

                                    @jon Aha! This is a totally different explanation-story then one would expect nowadays. Amazing. Thanks for posting 🖖🏼

                                    @saruwine

                                    1 Reply Last reply
                                    0
                                    • jon@gruene.socialJ jon@gruene.social

                                      Looks like the 13:47 Haparanda - Boden is *also* cancelled So I *might* be able to leave Haparanda at 19:38, and then get the night train at 22:18 from Boden

                                      So I *might* be able to leave Haparanda at 19:38, and then get the night train at 22:18 from Boden to Stockholm - have reserved a (cancellable) bed on that in case it does work 🙂

                                      oskarimkeller@fnordon.deO This user is from outside of this forum
                                      oskarimkeller@fnordon.deO This user is from outside of this forum
                                      oskarimkeller@fnordon.de
                                      wrote sidst redigeret af
                                      #241

                                      @jon
                                      Did you expect being stopped in your tracks so soon in the trip? Or was Sweden always a risky country to cross?

                                      1 Reply Last reply
                                      0
                                      • violanders@mastodon.nuV violanders@mastodon.nu

                                        @tml @Jonas_Bostrom @jon @nafmo @sebwilken @stefanlindbohm My bad - it was double track! The Haparanda line was unelectrified.

                                        jonas_bostrom@mastodonsweden.seJ This user is from outside of this forum
                                        jonas_bostrom@mastodonsweden.seJ This user is from outside of this forum
                                        jonas_bostrom@mastodonsweden.se
                                        wrote sidst redigeret af
                                        #242

                                        @violanders No, it was two single track lines next to each other. @tml @jon @nafmo @sebwilken @stefanlindbohm

                                        violanders@mastodon.nuV 1 Reply Last reply
                                        0
                                        • jonas_bostrom@mastodonsweden.seJ jonas_bostrom@mastodonsweden.se

                                          @violanders No, it was two single track lines next to each other. @tml @jon @nafmo @sebwilken @stefanlindbohm

                                          violanders@mastodon.nuV This user is from outside of this forum
                                          violanders@mastodon.nuV This user is from outside of this forum
                                          violanders@mastodon.nu
                                          wrote sidst redigeret af
                                          #243

                                          @Jonas_Bostrom @tml @jon @nafmo @sebwilken @stefanlindbohm

                                          The whole story is this: From the beginning (1900) the Haparanda line had its own track all the way to Boden C, parallell to Malmbanan ("the Ore line".) 1921 the ore train bypass at Boden C was built and Malmbanan and the Haparanda line switched tracks north of Boden with the Haparanda line crossing Malmbanan by bridge. The purpose was to minimise the conflicts between the iron ore trains and other traffic. ->

                                          violanders@mastodon.nuV 1 Reply Last reply
                                          0
                                          Svar
                                          • Svar som emne
                                          Login for at svare
                                          • Ældste til nyeste
                                          • Nyeste til ældste
                                          • Most Votes


                                          • Log ind

                                          • Har du ikke en konto? Tilmeld

                                          • Login or register to search.
                                          Powered by NodeBB Contributors
                                          Graciously hosted by data.coop
                                          • First post
                                            Last post
                                          0
                                          • Hjem
                                          • Seneste
                                          • Etiketter
                                          • Populære
                                          • Verden
                                          • Bruger
                                          • Grupper