Welcome to the #LongestTrainEU #CrossBorderRail record breaking thread!
-
So I just called Norrtåg
There is a power line down somewhere. If it is fixed in time, 7185 will be a train. If it is NOT fixed in time it will be a bus...

So how bad is this power line failure?
@jon Can be a press of a button or a full replacement of equipment

️ -
@jon Can be a press of a button or a full replacement of equipment

️@stefanlindbohm Is there any website that explains this in any way? If this were DB at least I would half know how serious it was!
-
Right then, this post outlines my options
1) Change my rules, take the rail replacement bus, and do major re-planning, and lower risk connections
2) Stick to my rules, and rely on tight connections later on in the journey
Input welcome! I lean towards 2)
https://crossborderrail.eu/messy-options-from-haparanda-to-hamburg/
@jon Do the Eurovision thing and the ask the public to vote on a paying number.
-
So I just called Norrtåg
There is a power line down somewhere. If it is fixed in time, 7185 will be a train. If it is NOT fixed in time it will be a bus...

So how bad is this power line failure?
@jon Trafikverket estimates that it will take all day to fix. Could of course be just a pessimistic estimate, but it doesn't sound promising for 7185.
-
@stefanlindbohm Is there any website that explains this in any way? If this were DB at least I would half know how serious it was!
@jon The closest that is public is this below link.
It mentions an electrical fault between Boden - Murjek which is mainly on Malmbanan, but it includes the short section where Haparandabanan branches off. So maybe it’s the one?
Estimated resolved tonight, so that’s not promising if so…
https://www.trafikverket.se/trafikinformation/meddelanden/?Counties=25&Filtertype=trainMessage
-
@jon Trafikverket estimates that it will take all day to fix. Could of course be just a pessimistic estimate, but it doesn't sound promising for 7185.
@gufo Hmm, but Murjek is the *other line* - towards Kiruna. Or is all of Boden disrupted?

-
@jon Trafikverket estimates that it will take all day to fix. Could of course be just a pessimistic estimate, but it doesn't sound promising for 7185.
@jon OTOH this might be an unrelated fault: Murjek is west of Boden, so I guess it depends on whether Boden station has power or not. Tricky.
-
@jon The closest that is public is this below link.
It mentions an electrical fault between Boden - Murjek which is mainly on Malmbanan, but it includes the short section where Haparandabanan branches off. So maybe it’s the one?
Estimated resolved tonight, so that’s not promising if so…
https://www.trafikverket.se/trafikinformation/meddelanden/?Counties=25&Filtertype=trainMessage
@jon If we have someone working at an operator, they have access to internal systems which is similar to the DB ones in Germany, with more detailed info not available to the public. I don’t have this access :((
-
@jon The closest that is public is this below link.
It mentions an electrical fault between Boden - Murjek which is mainly on Malmbanan, but it includes the short section where Haparandabanan branches off. So maybe it’s the one?
Estimated resolved tonight, so that’s not promising if so…
https://www.trafikverket.se/trafikinformation/meddelanden/?Counties=25&Filtertype=trainMessage
@stefanlindbohm Has anything else left Boden I wonder?
-
Right then, this post outlines my options
1) Change my rules, take the rail replacement bus, and do major re-planning, and lower risk connections
2) Stick to my rules, and rely on tight connections later on in the journey
Input welcome! I lean towards 2)
https://crossborderrail.eu/messy-options-from-haparanda-to-hamburg/
@jon 2. Stay pure.
-
So I just called Norrtåg
There is a power line down somewhere. If it is fixed in time, 7185 will be a train. If it is NOT fixed in time it will be a bus...

So how bad is this power line failure?
@jon @sebwilken @tml @Jonas_Bostrom @stefanlindbohm Those things take everything from a few hours to half a day to fix, down south where there are a lot of trains.
Up north off the main lines, who knows. Depends how long they have to travel to get to the troubled spot.
The rail replacement taxi will be in the Interrail system, so should be fine for the record attempt?
Anyway, the worst timing possible...
-
@jon OTOH this might be an unrelated fault: Murjek is west of Boden, so I guess it depends on whether Boden station has power or not. Tricky.
@gufo Right. That's what's hard to estimate!
-
@stefanlindbohm Is there any website that explains this in any way? If this were DB at least I would half know how serious it was!
@jon A replacement bus is scheduled at 0741, it even shows the registration number. If you change your rules. https://www.trafikverket.se/trafikinformation/tag/?Train=7183-TR-5068-7181-20260908
-
@jon A replacement bus is scheduled at 0741, it even shows the registration number. If you change your rules. https://www.trafikverket.se/trafikinformation/tag/?Train=7183-TR-5068-7181-20260908
@interrailinfosvenska Yes, I have that on the screens here!
-
Most important: can any people even better versed in the mess of Swedish rail that me tell me what the chances are that Norrtåg 7185 Haparanda - Boden - Luleå is going to ALSO be replaced by a bus?
It currently looks like it will be a train...
@jon @sebwilken @tml @Jonas_Bostrom @stefanlindbohm The inbound trip is listed as "await time", so the chances of it arriving Haparanda in time to turn around seem slim.
-
@stefanlindbohm Has anything else left Boden I wonder?
@jon There’s a SJ train schedules to leave just about now. But it arrived and departs from/to the south. So might not be affected depending on how the power sections are arranged.
-
@jon @sebwilken @tml @Jonas_Bostrom @stefanlindbohm Those things take everything from a few hours to half a day to fix, down south where there are a lot of trains.
Up north off the main lines, who knows. Depends how long they have to travel to get to the troubled spot.
The rail replacement taxi will be in the Interrail system, so should be fine for the record attempt?
Anyway, the worst timing possible...
@nafmo @sebwilken @tml @Jonas_Bostrom @stefanlindbohm but the problem is between Boden and Murjek: https://www.trafikverket.se/trafikinformation/meddelanden/?Counties=25&Filtertype=trainMessage The question then is WHERE, and if this impacts the small part of the track exiting Boden that the line to Haparanda takes?
-
@gufo Right. That's what's hard to estimate!
@jon Either way, it's the only power failure I can find documented, so it's likely this one — and with a long time to recovery. You may need to consider changing your rules, which opens the door for someone else to make a "clean" run (without emergency replacement traffic).
-
@jon Either way, it's the only power failure I can find documented, so it's likely this one — and with a long time to recovery. You may need to consider changing your rules, which opens the door for someone else to make a "clean" run (without emergency replacement traffic).
@jon I don't envy that decision

-
@nafmo @sebwilken @tml @Jonas_Bostrom @stefanlindbohm but the problem is between Boden and Murjek: https://www.trafikverket.se/trafikinformation/meddelanden/?Counties=25&Filtertype=trainMessage The question then is WHERE, and if this impacts the small part of the track exiting Boden that the line to Haparanda takes?
@jon @nafmo @sebwilken @Jonas_Bostrom @stefanlindbohm Well, I guess if Trafikverket says they need the whole line Boden–Murjek for urgent maintenance, Norrtåg can not say "but we only need to use it for a couple of kilometres a couple of times per day pretty please!?" Ordnung muss sein! Safety First!